π¨π¦Canada
1995-2000 Dodge Avenger 2.0L I4
Coupling Bolt
Tie Rod Assembly
34
Nm
=
25
lb-ft
Critical Torque
Labor Time for Tie Rod Assembly:1.5 hours
View Labor Time DetailsAll Tie Rod Assembly Torque Specs
View Full PageOther Torque Specs for This Vehicle
Disclaimer: Always verify torque specifications with your vehicle's service manual. These values are provided as a reference and may vary based on specific vehicle configurations.