ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’
πŸ‡©πŸ‡ͺGermany

Engine Rebuild Torque Specifications

1995-2000 Dodge Avenger 2.0L I4

Labor Time:25 hours
View Labor Time Details

Torque Values (25 specifications)

ComponentNmlb-ftNotes
2518β€”
1410Tighten in sequence, 3 passes
⚠️
1410Tighten in sequence from center outward, multiple passes
4533TTY - critical torque plus angle
1612β€”
180133Often TTY - check spec, may require impact
6548TTY - tighten in sequence plus angle
75β€”
3022Apply anti-seize, work hot-to-cold
⚠️
9570Often TTY, tighten in star pattern
⚠️
2015β€”
2015Clean mating surfaces
2518β€”
7555TTY - tighten in sequence plus angle
⚠️
4735β€”
⚠️
3526Use new crush washer
⚠️
129Tighten in sequence
⚠️
129β€”
129β€”
118β€”
118β€”
129Replace if worn
2518Install with pin/clip to compress
2518Tighten in sequence
107Tighten in sequence

Other Jobs with Torque Specs

Common Questions

What is the torque spec for engine rebuild on a 1995-2000 Dodge Avenger?

The primary torque specification for engine rebuild on a 1995-2000 Dodge Avenger is 25 Nm (18 lb-ft).

How many torque specs are there for Dodge Avenger engine rebuild?

There are 25 torque specifications for engine rebuild on the 1995-2000 Dodge Avenger 2.0L I4, covering all related fasteners and components.