ShopBaseComplete shop management for auto repair shops Β· $249/mo
Try ShopBase β†’

2009-2009 Audi R8 Starter Torque Specs

4.2L V8

The 2009 Audi R8 is equipped with a 4.2L V8 engine. Below you'll find detailed starter torque specifications information including labor time estimates, cost ranges, and technician notes specific to this engine configuration.

Share:XFB
Labor Time:2.4 hours
View Labor Time Details β†’

πŸ”§ Torque Values10 specifications

Componentlb-ftNmNotes
⚠️
1014β€”
57β€”
1520β€”
34β€”
⚠️
1014β€”
⚠️
1014Clean contact surfaces
⚠️
2534β€”
57β€”
3547β€”
⚠️
57β€”
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Starter Torque Specs on Other Vehicles

Common Questions

What is the torque spec for starter on a 2009-2009 Audi R8?

The primary torque specification for starter on a 2009-2009 Audi R8 is 14 Nm (10 lb-ft).

How many torque specs are there for Audi R8 starter?

There are 10 torque specifications for starter on the 2009-2009 Audi R8 4.2L V8, covering all related fasteners and components.

Last updated: March 2026

View Labor Times | View Fluid Specs | View DTC Codes