ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’

Intermediate Pipe Torque Specifications

1990-1995 BMW 525i E34 2.5L I6 M50

Labor Time:1.4 hours
View Labor Time Details β†’

πŸ”§ Torque Values5 specifications

Componentlb-ftNmNotes
811β€”
⚠️
3547β€”
1520β€”
2027β€”
⚠️
3547β€”
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Intermediate Pipe Torque Specs on Other Vehicles

Common Questions

What is the torque spec for intermediate pipe on a 1990-1995 BMW 525i E34?

The primary torque specification for intermediate pipe on a 1990-1995 BMW 525i E34 is 11 Nm (8 lb-ft).

How many torque specs are there for BMW 525i E34 intermediate pipe?

There are 5 torque specifications for intermediate pipe on the 1990-1995 BMW 525i E34 2.5L I6 M50, covering all related fasteners and components.

View Labor Times | View Fluid Specs