Front Pipe Torque Specifications
1997-2000 BMW Z3 2.8 2.8L I6
Labor Time:2.2 hours
View Labor Time Details βOther Jobs with Torque Specs
Front Pipe Torque Specs on Other Vehicles
Common Questions
What is the torque spec for front pipe on a 1997-2000 BMW Z3 2.8?
The primary torque specification for front pipe on a 1997-2000 BMW Z3 2.8 is 11 Nm (8 lb-ft).
How many torque specs are there for BMW Z3 2.8 front pipe?
There are 5 torque specifications for front pipe on the 1997-2000 BMW Z3 2.8 2.8L I6, covering all related fasteners and components.