ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’

Tail Light Assembly Torque Specifications

2001-2010 Chrysler Sebring 2.4L I4

Labor Time:0.5 hours
View Labor Time Details β†’

πŸ”§ Torque Values7 specifications

Componentlb-ftNmNotes
811β€”
⚠️
1014β€”
1.52β€”
2027β€”
⚠️
2534β€”
68β€”
⚠️
57β€”
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Tail Light Assembly Torque Specs on Other Vehicles

Common Questions

What is the torque spec for tail light assembly on a 2001-2010 Chrysler Sebring?

The primary torque specification for tail light assembly on a 2001-2010 Chrysler Sebring is 11 Nm (8 lb-ft).

How many torque specs are there for Chrysler Sebring tail light assembly?

There are 7 torque specifications for tail light assembly on the 2001-2010 Chrysler Sebring 2.4L I4, covering all related fasteners and components.

View Labor Times | View Fluid Specs | View DTC Codes