ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’

1995-1999 Dodge Neon Fuse Box - Engine Bay Torque Specs

2.0L I4 SOHC

Applies to 1995, 1996, 1997, 1998, and 1999 Dodge Neon

Labor Time:2 hours
View Labor Time Details β†’

πŸ”§ Torque Values11 specifications

Componentlb-ftNmNotes
46Do not overtighten
1520β€”
34β€”
811β€”
⚠️
1014β€”
⚠️
1014Clean contact surfaces
912Ensure clean contact
68β€”
⚠️
2534β€”
710β€”
⚠️
57β€”
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Fuse Box - Engine Bay Torque Specs on Other Vehicles

Common Questions

What is the torque spec for fuse box - engine bay on a 1995-1999 Dodge Neon?

The primary torque specification for fuse box - engine bay on a 1995-1999 Dodge Neon is 6 Nm (4 lb-ft). Note: Do not overtighten

How many torque specs are there for Dodge Neon fuse box - engine bay?

There are 11 torque specifications for fuse box - engine bay on the 1995-1999 Dodge Neon 2.0L I4 SOHC, covering all related fasteners and components.

View Labor Times | View Fluid Specs | View DTC Codes