ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’

Tail Light Assembly Torque Specifications

2000-2012 Mitsubishi Eclipse 2.4L I4

Labor Time:0.5 hours
View Labor Time Details β†’

πŸ”§ Torque Values10 specifications

Componentlb-ftNmNotes
57β€”
1520β€”
34β€”
811β€”
⚠️
1014β€”
⚠️
1014Clean contact surfaces
1.52β€”
⚠️
2534β€”
68β€”
⚠️
57β€”
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Tail Light Assembly Torque Specs on Other Vehicles

Common Questions

What is the torque spec for tail light assembly on a 2000-2012 Mitsubishi Eclipse?

The primary torque specification for tail light assembly on a 2000-2012 Mitsubishi Eclipse is 7 Nm (5 lb-ft).

How many torque specs are there for Mitsubishi Eclipse tail light assembly?

There are 10 torque specifications for tail light assembly on the 2000-2012 Mitsubishi Eclipse 2.4L I4, covering all related fasteners and components.

View Labor Times | View Fluid Specs | View DTC Codes