ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’

Tail Light Assembly Torque Specifications

1998-2002 Rolls-Royce Silver Seraph 5.4L V12

Labor Time:0.5 hours
View Labor Time Details β†’

πŸ”§ Torque Values12 specifications

Componentlb-ftNmNotes
68β€”
1926β€”
45β€”
1014β€”
⚠️
1317β€”
⚠️
1216Clean contact surfaces
1.52β€”
2534β€”
⚠️
3142β€”
⚠️
3142β€”
68β€”
⚠️
68β€”
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Tail Light Assembly Torque Specs on Other Vehicles

Common Questions

What is the torque spec for tail light assembly on a 1998-2002 Rolls-Royce Silver Seraph?

The primary torque specification for tail light assembly on a 1998-2002 Rolls-Royce Silver Seraph is 8 Nm (6 lb-ft).

How many torque specs are there for Rolls-Royce Silver Seraph tail light assembly?

There are 12 torque specifications for tail light assembly on the 1998-2002 Rolls-Royce Silver Seraph 5.4L V12, covering all related fasteners and components.

View Labor Times | View Fluid Specs | View DTC Codes