ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’

1990-2002 Toyota 4Runner Valve Adjustment Torque Specs

2.7L I4

Applies to 1990, 1991, 1992, 1993, 1994, 1995, 1996, 1997, 1998, 1999, 2000, 2001, and 2002 Toyota 4Runner

Labor Time:2.3 hours
View Labor Time Details β†’

πŸ”§ Torque Values13 specifications

Componentlb-ftNmNotes
1317β€”
1318β€”
57β€”
⚠️
1621β€”
1622Clean mating surfaces
2128β€”
⚠️
3750β€”
⚠️
3750β€”
⚠️
2230Tighten with cam lobe pointing away
811β€”
811β€”
710Tighten in sequence
1520Hold screw while tightening
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Valve Adjustment Torque Specs on Other Vehicles

Common Questions

What is the torque spec for valve adjustment on a 1990-2002 Toyota 4Runner?

The primary torque specification for valve adjustment on a 1990-2002 Toyota 4Runner is 17 Nm (13 lb-ft).

How many torque specs are there for Toyota 4Runner valve adjustment?

There are 13 torque specifications for valve adjustment on the 1990-2002 Toyota 4Runner 2.7L I4, covering all related fasteners and components.

View Labor Times | View Fluid Specs | View DTC Codes