ShopBaseFree forever shop management software for auto repair shops
Try ShopBase Free β†’

1991-1997 Toyota Previa Shift Cable Torque Specs

2.4L I4

Applies to 1991, 1992, 1993, 1994, 1995, 1996, and 1997 Toyota Previa

Labor Time:1.5 hours
View Labor Time Details β†’

πŸ”§ Torque Values5 specifications

Componentlb-ftNmNotes
811β€”
2027β€”
⚠️
4561β€”
⚠️
1216β€”
811β€”
⚠️ = Critical torque value | Always verify with vehicle-specific service manual
⚠️ Some critical specs are estimated. Please verify sequence.

Other Jobs with Torque Specs

Shift Cable Torque Specs on Other Vehicles

Common Questions

What is the torque spec for shift cable on a 1991-1997 Toyota Previa?

The primary torque specification for shift cable on a 1991-1997 Toyota Previa is 11 Nm (8 lb-ft).

How many torque specs are there for Toyota Previa shift cable?

There are 5 torque specifications for shift cable on the 1991-1997 Toyota Previa 2.4L I4, covering all related fasteners and components.

View Labor Times | View Fluid Specs | View DTC Codes