Shift Linkage Torque Specifications
2001-2007 Toyota Sequoia 4.7L V8
Labor Time:1.2 hours
View Labor Time Details βOther Jobs with Torque Specs
Shift Linkage Torque Specs on Other Vehicles
Common Questions
What is the torque spec for shift linkage on a 2001-2007 Toyota Sequoia?
The primary torque specification for shift linkage on a 2001-2007 Toyota Sequoia is 11 Nm (8 lb-ft).
How many torque specs are there for Toyota Sequoia shift linkage?
There are 16 torque specifications for shift linkage on the 2001-2007 Toyota Sequoia 4.7L V8, covering all related fasteners and components.