engine
Intake Manifold Gasket
for 1970 AMC Rebel Machine 390ci V8 · RWD
Difficulty
Advanced
Time
5.5 h
Tools
16
Steps
15
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
Replace the intake manifold gaskets on the 390ci V8 engine to restore proper sealing between the intake manifold and cylinder heads, preventing vacuum leaks and coolant/oil seepage.
Warnings
⚠️Allow engine to cool completely before starting work. Coolant system operates under pressure and can cause severe burns if opened when hot.
⚠Mark all vacuum lines, fuel lines, and electrical connections before removal to ensure correct reassembly. Improper routing can cause engine damage or fire.
⚠The intake manifold on the AMC 390 is heavy (approximately 40-50 lbs). Use proper lifting technique and have an assistant available to avoid injury or dropping the manifold onto engine components.
ℹ️The AMC 390 uses a valley cover under the intake manifold. Inspect this cover for damage during gasket replacement.
Tools required
Socket set (3/8" and 1/2" drive)Essential
Combination wrench set (1/2" - 3/4")Essential
Torque wrench (0-150 ft-lbs)Essential
Flathead screwdriver setEssential
Gasket scraperEssential
Pliers (standard and needle-nose)Essential
Wire brush (brass preferred)Essential
Degreaser/brake cleanerEssential
Clean lint-free ragsEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Intake manifold gasket set × 1 — Use OEM specification for AMC 390 V8
- Intake manifold end seals (front and rear) × 1 — Use OEM specification
- RTV silicone gasket maker (high-temp) × 1 — Red or black RTV rated to 500°F
- Carburetor base gasket × 1 — Use OEM specification
- Coolant × 1 — Ethylene glycol based, appropriate for cast iron
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Fluids
- Engine coolant (50/50 mix) — 4 qt
Preparation
- Ensure engine is completely cold to the touch
- Disconnect negative battery cable
- Place drain pan under radiator and drain coolant by opening petcock or removing lower radiator hose
- Remove air cleaner assembly and set aside
- Label all vacuum lines with tape and marker for reinstallation reference
- Photograph or diagram vacuum line routing, ignition wire routing, and linkage connections
- Relieve any residual fuel system pressure by loosening fuel line at carburetor slightly
- Have clean workspace prepared for intake manifold storage during gasket replacement
Procedure
- 1Remove carburetor and linkagesDisconnect throttle linkage, kickdown linkage (if automatic transmission), and choke cable from carburetor. Disconnect fuel line at carburetor inlet using two wrenches to prevent twisting the line. Disconnect all vacuum lines from carburetor ports. Remove carburetor mounting nuts (typically 4) and carefully lift carburetor straight up off manifold. Plug intake manifold openings with clean rags to prevent debris entry.
- 2Disconnect electrical and vacuum connectionsDisconnect distributor vacuum advance line. Disconnect coolant temperature sender wire. Remove PCV valve from valve cover and disconnect PCV hose from intake manifold. Disconnect brake booster vacuum line from intake manifold. Disconnect any remaining vacuum accessories such as heated air intake control or emissions equipment.
- 3Remove distributorMark the position of distributor rotor relative to distributor body with a marker. Mark the position of distributor body relative to intake manifold. Remove distributor hold-down bolt and clamp. Carefully pull distributor straight up and out of engine. Do NOT rotate the engine crankshaft with distributor removed or timing will be lost.
- 4Disconnect coolant hoses and bypassDisconnect upper radiator hose from intake manifold outlet (if equipped). Disconnect heater hoses from intake manifold fittings. Disconnect coolant bypass hose at front of intake manifold. Have drain pan positioned to catch residual coolant.
- 5Remove intake manifold boltsStarting from the outer bolts and working toward the center, loosen all intake manifold mounting bolts in a crisscross pattern. The AMC 390 typically uses 12 bolts securing the intake manifold. Remove all bolts completely and store in organized manner. Note that some bolts may be different lengths.
- 6Remove intake manifoldCarefully pry intake manifold loose from cylinder heads using flathead screwdriver in designated pry points (typically at front or rear). Do not pry between gasket surfaces. Once loose, lift manifold straight up and away from engine. The manifold is heavy; use proper lifting technique or get assistance. Place manifold on clean work surface gasket-side up.
- 7Remove old gaskets and clean surfacesRemove and discard old intake manifold gaskets and end seals. Use gasket scraper and razor blade to carefully remove all old gasket material from cylinder head surfaces and intake manifold mating surfaces. Be extremely careful not to gouge aluminum or cast iron surfaces. Clean all surfaces thoroughly with brake cleaner and lint-free rags. Inspect valley cover for damage or warping. Use shop vacuum to remove all debris from valley area and intake ports. Surfaces must be completely clean and dry.
- 8Inspect intake manifold and valley coverInspect intake manifold for cracks, warping, or damage. Check manifold mating surfaces with straightedge for warping (should be flat within 0.003 inches). Inspect valley cover for corrosion or damage. Replace valley cover if compromised. Check all coolant passages for blockage or corrosion buildup.
- 9Install new gaskets and sealsApply thin bead of RTV silicone to cylinder block at front and rear where end seals will contact timing cover and rear main cap. Position new front and rear end seals, ensuring they sit flush against block surface. Apply small dabs of RTV at four corners where end seals meet cylinder head gaskets to lock gaskets in place. Position new intake manifold gaskets on cylinder heads, ensuring all port openings align correctly. Some gaskets have alignment tabs that lock into cylinder head holes. Apply thin bead of RTV around coolant passage openings on gasket surface.
- 10Install intake manifoldCarefully lower intake manifold into position, ensuring gaskets remain in place and all bolt holes align. Guide manifold straight down to avoid shifting gaskets. Once seated, verify all gaskets are properly positioned by checking through bolt holes. Install all intake manifold bolts finger-tight, starting from center and working outward.
- 11Torque intake manifold boltsTorque intake manifold bolts in three stages using a crisscross pattern from center outward. First pass: torque all bolts to 15 ft-lbs. Second pass: torque all bolts to 25 ft-lbs. Final pass: torque all bolts to 35-40 ft-lbs (consult factory specifications for exact value). Allow RTV silicone to set for 15-20 minutes before proceeding.
- 12Reinstall distributorEnsure engine crankshaft has not been rotated. Align distributor rotor with mark made during disassembly. Insert distributor into engine, aligning distributor body with mark on intake manifold. The distributor should drop into place when oil pump drive shaft engages. If it does not seat fully, rotate rotor slightly while applying gentle downward pressure. Install hold-down clamp and bolt, leaving slightly loose for timing adjustment.
- 13Reconnect coolant hoses and electrical connectionsReconnect heater hoses to intake manifold fittings using new clamps if originals are degraded. Reconnect upper radiator hose and coolant bypass hose. Reconnect coolant temperature sender wire. Install PCV valve and connect PCV hose. Reconnect distributor vacuum advance line. Reconnect brake booster vacuum line and all other vacuum lines according to diagram or labels created during disassembly.
- 14Reinstall carburetorRemove rags from intake manifold openings. Install new carburetor base gasket. Carefully position carburetor onto intake manifold, ensuring gasket remains in place. Install carburetor mounting nuts and tighten in crisscross pattern to 12-15 ft-lbs (hand-tight plus 1/4 turn). Reconnect fuel line using two wrenches. Reconnect throttle linkage, kickdown linkage, and choke cable. Reconnect all vacuum lines to carburetor ports according to reference diagram.
- 15Refill coolant and prepare for startupClose radiator petcock or reinstall lower radiator hose if removed. Fill cooling system with appropriate 50/50 coolant mix. Fill until radiator is full and coolant is visible in overflow tank at proper level. Reconnect negative battery cable. Double-check all connections, hoses, and linkages for proper installation. Install air cleaner assembly.
Reassembly
- After initial startup, allow engine to reach operating temperature and check for coolant leaks around intake manifold
- Check for vacuum leaks by listening for hissing sounds around intake manifold base and gasket area
- Retorque intake manifold bolts to specification after engine has completed one full heat cycle (warm up and cool down)
- Adjust distributor timing to factory specification using timing light (typically 5° BTDC at idle for 1970 AMC 390)
- Adjust carburetor idle speed and mixture after engine reaches operating temperature
- Top off coolant level after first heat cycle as air pockets work out of system
Verification
- Start engine and verify smooth idle with no rough running or misfiring
- Check for coolant leaks at all intake manifold hose connections and gasket surfaces
- Check for vacuum leaks by spraying carburetor cleaner around intake manifold base while engine idles - RPM change indicates leak
- Verify proper engine operating temperature (180-195°F) and confirm thermostat operation
- Test throttle response and verify all linkages operate smoothly through full range
- Check for oil contamination in coolant or coolant contamination in oil which would indicate internal gasket leak
- After 500 miles of operation, recheck intake manifold bolt torque and retighten if necessary