engine
Piston Rings - All
for 2009 Aston Martin DB9 6.0L V12 · RWD
Difficulty
Expert
Time
48.0 h
Tools
25
Steps
15
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
Complete disassembly of the 6.0L V12 engine to replace all piston rings, requiring cylinder head removal, piston extraction, ring installation, and full reassembly with precise torque sequences.
Warnings
⚠️Engine removal requires proper lifting equipment rated for at least 500 lbs. Improper lifting can cause severe injury or death.
⚠️Allow engine to cool completely (minimum 4 hours) before beginning work. Hot components can cause severe burns.
⚠Cylinder head bolts, connecting rod bolts, and main bearing cap bolts are torque-to-yield (TTY) and MUST be replaced. Reusing TTY fasteners will result in catastrophic engine failure.
⚠Maintain absolute cleanliness during assembly. Any debris entering cylinders or oil passages can destroy the engine.
⚠Mark all connecting rods and caps with their cylinder number and orientation before removal. Mixing components will cause bearing failure.
ℹ️This procedure assumes cylinders are within wear specifications and do not require boring or honing. Measure all cylinder bores and consult machine shop if out-of-round exceeds 0.002 inch or taper exceeds 0.005 inch.
ℹ️Document the routing of all vacuum lines, electrical connectors, and coolant hoses with photos before disassembly.
Tools required
Engine hoist with load levelerEssential
Engine stand rated for 500+ lbsEssential
Torque angle gaugeEssential
Piston ring expander toolEssential
Ridge reamer for cylinder boresEssential
Dial bore gauge (85-95mm range)Essential
Feeler gauge set (0.001-0.040 inch)Essential
Torque wrench (10-100 Nm range)Essential
Torque wrench (100-200 Nm range)Essential
Piston ring groove cleanerEssential
Bearing plastigage kitEssential
E-Torx socket set (E6-E18)Essential
Torx socket set (T20-T55)Essential
Drain pan (12+ quart capacity)Essential
Compressed air source with blow gunEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Piston ring set (complete for 12 cylinders) × 1 — Use OEM specification
- Cylinder head gasket set (both banks) × 1 — Use OEM specification
- Valve cover gaskets (both banks) × 2 — Use OEM specification
- Oil pan gasket × 1 — Use OEM specification
- Timing cover gasket × 1 — Use OEM specification
- Intake manifold gasket set × 1 — Use OEM specification
- Exhaust manifold gaskets × 2 — Use OEM specification
- Connecting rod bolts (TTY) × 24 — Use OEM specification
- Cylinder head bolts (TTY) × 48 — Use OEM specification
- Main bearing cap bolts (TTY) × 14 — Use OEM specification
- Oil filter × 1 — Use OEM specification
- Oil drain plug crush washer × 1 — Use OEM specification
- Coolant hoses (replace any damaged) × 1 — Inspect and replace as needed
- Spark plugs (full set) × 12 — Use OEM specification
- RTV silicone sealant (high-temp) × 2 — Permatex Ultra Black or equivalent
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Fluids
- 5W-30 engine oil — 10.5 qt
- OAT 50/50 coolant — 10.5 qt
Preparation
- Park vehicle on level surface and engage parking brake. Place wheel chocks behind rear wheels.
- Disconnect negative battery terminal and wait 10 minutes for system capacitors to discharge.
- Drain engine coolant completely by opening radiator drain and engine block drain plugs into suitable container.
- Drain engine oil completely and remove oil filter.
- Relieve fuel system pressure by removing fuel pump fuse and cranking engine until it will not start.
- Remove engine cover (lift from rear, disengage front clips).
- Document all electrical connectors, vacuum lines, and hose routing with detailed photographs from multiple angles.
- Label all connectors with masking tape and permanent marker indicating their position.
- Support vehicle on jack stands at manufacturer-specified lift points if accessing components from below.
Procedure
- 1Remove intake system and accessoriesRemove air intake ducts and airbox assembly. Disconnect throttle body electrical connectors and vacuum lines. Remove intake plenum (upper intake manifold) by disconnecting all vacuum lines and electrical connectors, then removing mounting bolts in reverse of tightening sequence (work from outer bolts inward). Remove fuel rails with injectors attached - disconnect fuel lines using the correct tool for the fitting type on this vehicle (verify quick-disconnect vs threaded fittings), disconnect injector electrical connectors, then remove fuel rail mounting bolts. Cap all fuel line openings immediately. Remove alternator, power steering pump, and A/C compressor (leave hoses attached and secure assemblies aside). Remove accessory drive belt tensioner and idler pulleys. Note: removing mounting bolts (loosen evenly in reverse of the factory tightening sequence per the service manual for this intake design)
- 2Remove exhaust and cooling componentsRemove both exhaust manifolds by disconnecting exhaust pipes at flanges, then removing manifold mounting bolts (verify exact fastener counts against OEM documentation). Remove coolant crossover pipe connecting cylinder heads. Disconnect upper and lower radiator hoses, heater hoses, and all coolant bypass hoses. Remove thermostat housing. Remove water pump by removing its mounting bolts (verify exact bolt count against OEM documentation). Drain any remaining coolant from engine block. Note: Remove both exhaust manifolds by disconnecting exhaust pipes at flanges, then removing manifold mounting bolts (verify exact flange nut and manifold bolt counts for this VIN).
- 3Remove valve covers and timing componentsRemove ignition coil packs (one per cylinder, 12 total) - disconnect electrical connectors and remove mounting bolts. Remove valve covers from both banks - remove perimeter bolts (verify exact count against OEM documentation) and carefully lift covers, breaking gasket seal if needed. Remove front timing cover by removing all perimeter bolts of varying lengths (verify exact count against OEM documentation - note locations for reassembly). Rotate crankshaft to TDC on cylinder 1 and verify timing marks align on camshaft sprockets and crankshaft sprocket. Mark timing chain-to-sprocket positions with paint pen. Remove all timing chain tensioners and guides per the service manual (this DOHC V12 has primary and secondary chains plus variable valve timing actuators). Note the exact position of every chain, sprocket, and VVT unit before removal. Remove camshaft sprocket/VVT bolts and carefully remove sprockets with timing chains.
- 4Remove cylinder headsRemove lower intake manifold (if not already removed) by disconnecting all remaining vacuum lines and coolant passages, then removing mounting bolts in reverse order of tightening sequence. Remove cylinder head bolts from both banks in reverse order of tightening sequence (typically work from outer bolts toward center in three passes). Use breaker bar for initial loosening as bolts are torqued very tight. Carefully lift cylinder heads straight up - they are aluminum DOHC heads and may stick to the block due to gasket seal; verify exact weight but expect a two-hand lift, not 50-60 lbs each. Place cylinder heads on clean surface with combustion chambers facing up. Inspect head gasket surfaces on block for damage. Note: they are heavy and may require assistance to lift safely
- 5Remove oil pan and oil pumpAccess oil pan from below vehicle. Remove oil pan mounting bolts in crisscross pattern starting from outer bolts (verify exact bolt count against OEM documentation). Carefully break gasket seal and lower oil pan. Remove oil pump pickup tube mounting bolt and remove pickup tube from oil pump. Remove oil pump mounting bolts (verify exact bolt count against OEM documentation) and remove oil pump assembly from engine block front. Inspect oil pump drive chain and sprocket for wear.
- 6Remove ridge from cylinder boresRotate crankshaft to position each piston approximately 1 inch below top of cylinder bore. Using ridge reamer, carefully remove ridge at top of each cylinder bore where piston ring travel ends. The ridge forms from normal wear above the top ring's travel limit. Adjust ridge reamer according to manufacturer instructions and cut conservatively - remove only the ridge, not additional material from unworn bore. After each cylinder, wipe bore clean with lint-free cloth and inspect for damage. Place clean shop towels in cylinders to catch debris.
- 7Mark and remove connecting rod capsUsing permanent marker or stamping tool, mark each connecting rod and cap with cylinder number (1-12) and orientation (mark both rod and cap on same side, typically toward front of engine). Ensure marks are clearly visible and will not be confused during reassembly. Remove connecting rod cap bolts from cylinder 1 (2 bolts per rod) and carefully remove cap with bearing insert. Push piston and rod assembly up through cylinder bore until clear of crankshaft journal. Install connecting rod cap back onto rod loosely to keep bearings with correct rod. Repeat for all 12 cylinders, working on one connecting rod at a time. Keep all components organized by cylinder number.
- 8Remove pistons and inspect componentsRemove each piston/rod assembly from top of cylinder bore. Place each assembly in labeled container or on clean workspace marked with cylinder numbers. Using piston ring expander tool, carefully expand and remove top compression ring from each piston by spreading ring just enough to slide over piston crown - work slowly to avoid breaking rings during removal. Remove second compression ring same way. Remove oil control ring assembly (typically 3-piece: two rails and one expander). Clean piston ring grooves thoroughly using ring groove cleaner or broken piece of old ring, removing all carbon deposits. Inspect pistons for cracks, scuffing, or damage to ring lands. Measure cylinder bores using dial bore gauge at top, middle, and bottom of ring travel, checking for out-of-round and taper.
- 9Measure and prepare cylindersUsing dial bore gauge, measure each cylinder bore at 3 depths (top, middle, bottom of ring travel) and in 2 perpendicular directions (parallel and perpendicular to crankshaft). Record all measurements. Calculate taper (top to bottom difference) and out-of-round (perpendicular measurement differences). If any cylinder shows taper exceeding 0.005 inch or out-of-round exceeding 0.002 inch, cylinder boring and honing with oversized pistons is required - consult machine shop. If measurements are within specification, lightly hone cylinders with flex hone (180-220 grit) using drill at 300-500 RPM with honing oil, moving hone up and down to create 45-degree crosshatch pattern. Hone for 10-15 strokes until consistent crosshatch appears. Clean cylinders thoroughly with hot soapy water, dry completely, then wipe with clean white cloth dampened with light oil - cloth should show no gray residue when cylinders are properly cleaned.
- 10Install new piston ringsVerify new piston rings are correct for this application. Install oil control ring assembly first (bottom groove): install expander ring into groove (ensure ends butt together but do not overlap), then install lower rail followed by upper rail - stagger rail gaps 180 degrees apart. Install second (middle) compression ring into middle groove - note that many rings have 'TOP' mark that must face up, and ring has specific orientation (typically has step or chamfer on inside edge facing down). Install top compression ring into top groove - again verify 'TOP' marking faces up. After installing all three rings on one piston, arrange ring end gaps so they are staggered approximately 120 degrees apart (never align gaps). Use feeler gauge to check ring end gap: insert ring into cylinder bore (push with piston crown to square ring in bore at bottom of ring travel), then measure gap with feeler gauge - verify ring end gap against OEM/ring manufacturer specification for this engine (measure with feeler gauge and compare to documented spec). Repeat for all 12 pistons. Note: use the Aston Martin factory ring end-gap specification for this engine (verify exact values per service manual before installing) Note: verify ring end gap against Aston Martin OEM specification for both compression and oil rings before installation
- 11Install pistons and connecting rodsCoat cylinder walls with assembly lube or clean engine oil. Coat piston skirts and rings with assembly lube. Install connecting rod bearing inserts into rods and caps (ensure bearing locating tabs seat in their notches). Coat bearings with assembly lube. Note: these rods may be fracture-split (cracked) design — if so, the mating faces have no separate alignment tab and cap orientation is set by the fractured surface; never swap caps between rods. Position ring compressor around piston (ensure all rings are fully compressed into their grooves). Orient piston so that any directional marking (typically arrow on piston crown) points toward front of engine and connecting rod and piston orientation marks face as specified by OEM for each bank (verify correct orientation against OEM documentation before installation). Insert piston into its correct cylinder bore from top of block. Using wooden hammer handle or plastic mallet, gently tap piston crown while guiding connecting rod carefully past crankshaft journal until piston is fully seated in bore. Guide connecting rod onto crankshaft journal and pull cap down onto rod. Install NEW connecting rod bolts (TTY bolts must be replaced) and tighten in the stages, initial torque, and torque-to-yield angle specified in Aston Martin documentation (verify exact values before installation). Repeat for all 12 cylinders, installing pistons in their original cylinder locations.
- 12Install oil pump and oil panInstall oil pump onto engine block front with new gasket or RTV sealant as specified. Ensure oil pump drive chain or gear engages properly with crankshaft. Torque oil pump mounting bolts to the Aston Martin factory specification (verify exact value against OEM documentation — do not rely on a generic estimate). Install oil pump pickup tube with new O-ring and torque mounting bolt to specification. Clean oil pan and block mating surfaces thoroughly with gasket remover and solvent - surfaces must be completely clean and dry. Install new oil pan gasket or apply RTV silicone sealant in continuous bead (approximately 3-4mm wide) following manufacturer instructions for cure time. Position oil pan onto block and install all mounting bolts finger-tight. Tighten oil pan bolts to specification in crisscross pattern starting from center bolts and working outward. Note: Torque oil pump mounting bolts to OEM specification (verify exact torque value against OEM documentation). Note: Torque oil pump mounting bolts to the Aston Martin specified value (verify in OEM documentation).
- 13Install cylinder headsClean cylinder head and block mating surfaces thoroughly - surfaces must be completely free of old gasket material, oil, and debris. Inspect surfaces for warpage using straightedge and feeler gauge. Place new head gaskets onto block, ensuring all alignment dowels engage gasket holes and gaskets are oriented correctly (typically marked 'TOP' or 'FRONT'). Carefully lower cylinder heads onto block, guiding over alignment dowels. Install NEW cylinder head bolts (TTY bolts must be replaced) in their correct locations (bolts may be different lengths in different positions). Tighten cylinder head bolts following the exact OEM tightening sequence in the OEM-specified stages, including each initial torque value and the final torque-to-yield angle(s). Do not assume a 90-degree final angle — verify the complete sequence, torque values, and all angle stages against Aston Martin documentation before proceeding. Repeat for second cylinder head. Note: in multiple stages following the Aston Martin factory head-bolt torque sequence and torque-to-yield angle specification (verify exact initial torque and angle per service manual before assembly) Note: in the stages and to the exact torque and torque-to-yield angle specified in Aston Martin documentation (verify all stage values, final torque, and angle before installation) Note: Tighten cylinder head bolts following the exact tightening sequence specified in Aston Martin documentation
- 14Install timing components and valve trainRotate crankshaft to TDC position for cylinder 1. Install timing chains onto crankshaft sprocket and camshaft sprockets, ensuring timing marks align exactly as marked during disassembly (critical for proper valve timing). Install camshaft sprocket bolts and torque to OEM specification (verify exact torque value against OEM documentation). Install timing chain guides and tensioners. Verify timing marks align correctly one final time before proceeding - incorrect timing will cause catastrophic engine damage. Apply light coat of assembly lube to all camshaft lobes and valve stem tips. Install timing cover with new gasket, ensuring all bolt holes align. Install timing cover bolts (note different bolt lengths in different positions) and torque in crisscross pattern to specification.
- 15Complete final assemblyInstall valve covers with new gaskets, torquing bolts evenly in crisscross pattern to specification. Install water pump with new gasket and torque bolts to specification. Install thermostat housing with new gasket. Install intake manifolds (lower then upper) with new gaskets, torquing bolts in proper sequence from center outward. Install fuel rails with injectors, connecting all electrical connectors. Install exhaust manifolds with new gaskets, torquing bolts evenly to specification. Install all accessory components (alternator, power steering pump, A/C compressor, belt tensioner, idler pulleys). Install ignition coil packs and connect all electrical connectors. Reconnect all coolant hoses, vacuum lines, and fuel lines. Install new oil filter. Install engine cover. Refill engine with specified oil capacity and grade per Aston Martin handbook (approximately 11.6 liters / ~12.3 quarts of 5W-40 ACEA A3/B4 for this dry-sump system — verify exact capacity for this VIN). Refill cooling system with Aston Martin-approved coolant (ethylene-glycol, per factory specification) mixed 50/50 to the capacity listed in the service manual for this VIN (verify exact capacity). Reconnect battery negative terminal. Note: Refill cooling system with Aston Martin-specified coolant and capacity per OEM service data (verify exact coolant type and capacity before filling). Note: Refill engine with manufacturer-specified oil grade and capacity per Aston Martin service data (verify exact grade and capacity against OEM documentation before filling).
Reassembly
- Install all components in reverse order of removal, using new gaskets, seals, and TTY fasteners throughout.
- Follow all torque specifications and sequences exactly as specified, using torque angle gauge for TTY fasteners.
- Verify timing chain alignment marks are correct before installing timing cover - this is critical.
- Ensure all ring end gaps are properly staggered and rings are oriented correctly (TOP marks facing up).
- Keep all internal engine components absolutely clean - any debris will cause immediate failure.
Verification
- Before initial start: Remove all spark plugs and disconnect ignition system. Crank engine for 10-15 seconds to prime oil system. Verify oil pressure builds (install mechanical oil pressure gauge if possible). Reinstall spark plugs and reconnect ignition.
- Initial start: Start engine and immediately verify oil pressure registers on gauge. Listen for any unusual noises (knocking, rattling). If any abnormal sounds occur, shut down immediately and investigate.
- Allow engine to idle for 5 minutes while monitoring for leaks (oil, coolant, fuel). Check that coolant circulates properly and temperature gauge operates normally.
- Perform leak-down test or compression test on all cylinders after initial break-in (100-200 miles) to verify ring seal - all cylinders should be within 10% of each other.
- Monitor oil consumption and exhaust smoke during first 500 miles of operation - minimal oil consumption and no blue smoke indicates proper ring seal.
Related trouble codes on this vehicle
Codes that commonly send this job to the bay — tap one for symptoms, causes, and diagnostic steps.
Chasing one of these codes and not sure which part is guilty? Ask a master mechanic about YOUR car →