Free API
cooling

Water Pump

for 2009 Aston Martin DB9 6.0L V12 · RWD
Difficulty
Expert
Time
12.5 h
Tools
12
Steps
18
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.

Complete water pump replacement for the 2009 Aston Martin DB9 6.0L V12, requiring removal of front engine accessories, timing cover, and coolant system components.

Warnings

⚠️Allow engine to cool completely (minimum 3 hours) before beginning work. Coolant system operates at high pressure and temperature.
⚠The V12 engine is extremely heavy. Ensure proper engine support before removing motor mounts or suspension components.
⚠Timing alignment is critical. Incorrect installation can cause catastrophic engine damage. Use factory timing pins.
ℹ️This procedure requires disturbing the timing system. Mark all components before disassembly.
⚠OAT coolant is not compatible with conventional green coolant. Do not mix coolant types.

Tools required

As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.

Parts

As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.

Fluids

  • coolant — 10.5 qt

Preparation

  1. Park vehicle on level surface and engage parking brake
  2. Disconnect negative battery terminal and wait 10 minutes for system discharge
  3. Remove engine cover panels (secured with Torx fasteners)
  4. Place drain pan under radiator and open drain petcock to drain coolant completely
  5. Remove lower splash shields to access underside of engine
  6. Support engine weight with support fixture from above or hoist with load leveler

Procedure

  1. 1
    Remove Front Accessory Drive Components
    Using serpentine belt tensioner tool, rotate tensioner clockwise and remove serpentine belt. Remove belt tensioner assembly (note fastener count and positions during removal). Remove power steering pump with lines attached and secure aside with cable ties - do not disconnect hydraulic lines. Remove alternator mounting bolts and position alternator aside without disconnecting wiring harness. Remove air conditioning compressor mounting bolts and secure compressor aside without disconnecting refrigerant lines.
  2. 2
    Remove Front Engine Mounts and Lower Engine
    Verify the correct method to gain front timing cover and water pump access against Aston Martin service documentation before removing any engine mount through-bolts; the DB9 may require cooling pack/front-end removal rather than lowering the engine. Do not lower the engine unless the factory procedure specifies it, and monitor all clearances if engine movement is required.
  3. 3
    Drain Remaining Coolant and Disconnect Hoses
    Disconnect upper and lower radiator hoses at engine using hose clamp pliers or appropriate tool. Disconnect heater hoses at engine bay connections. Disconnect coolant bypass hoses connected to water pump and thermostat housing. Label all hoses with marker for correct reinstallation routing. Allow all coolant to drain completely into pan.
  4. 4
    Remove Crankshaft Pulley and Harmonic Balancer
    Using pulley holder tool to prevent crankshaft rotation, remove center crankshaft bolt (typically very high torque). Remove harmonic balancer using appropriate puller - do not pry or hammer. Mark balancer orientation to crankshaft with paint pen before removal for correct reinstallation timing alignment.
  5. 5
    Remove Timing Cover
    Remove all timing cover fasteners - the Aston Martin V12 timing cover is secured with multiple Torx bolts around perimeter. Note bolt lengths and positions as they vary. Carefully separate timing cover from engine block using plastic gasket scraper at seam. Do not pry against machined sealing surfaces. Remove timing cover and set aside.
  6. 6
    Lock Engine at TDC and Verify Timing Marks
    Confirm against Aston Martin service documentation whether water pump removal requires removal of the timing cover and locking of the valve timing. If the water pump is externally accessible, do NOT disturb timing components. If timing cover removal is genuinely required, rotate crankshaft to TDC cylinder 1, install factory timing pins to lock the camshafts, verify crankshaft keyway alignment, and photograph all timing marks and chain positions before proceeding.
  7. 7
    Remove Thermostat Housing
    Remove thermostat housing bolts and lift housing away from water pump area. Remove old gasket material and inspect thermostat condition. Set aside for reinstallation with new gasket.
    Torque spec
    Thermostat Housing Bolt15 Nm (11 lb-ft)
  8. 8
    Remove Water Pump Assembly
    Remove all water pump mounting bolts - count and note bolt positions as lengths may vary. Verify the exact water pump bolt count against factory service documentation before ordering fasteners or beginning reassembly. Carefully work water pump free from engine block using gentle rocking motion. Do not pry against sealing surface. Remove water pump and old gasket material.
    ⚠Water pump may be seized to block by corrosion. Use penetrating oil and patience - forcing can crack housing.
  9. 9
    Clean and Inspect Mounting Surfaces
    Using plastic gasket scraper and brake cleaner, thoroughly clean all gasket surfaces on engine block, timing cover mating area, and thermostat housing mating surface. Inspect water pump mounting surface for corrosion, pitting, or damage. Inspect coolant passages for debris or blockage. Clean passages with brake cleaner and compressed air if available.
  10. 10
    Install New Water Pump
    Position new water pump gasket on engine block - verify gasket orientation matches coolant passages. Apply thin bead of OEM-approved gasket sealant to gasket if specified by manufacturer. Position new water pump onto block, aligning all bolt holes. Install all water pump bolts finger-tight first to ensure proper alignment. Tighten bolts in criss-cross pattern to the factory-specified torque in progressive stages; verify the exact torque value and bolt count against Aston Martin service documentation before final tightening.
    Torque spec
    Water Pump Bolts25 Nm (18 lb-ft)
  11. 11
    Install Thermostat Housing
    Install new thermostat housing gasket. Position thermostat housing onto water pump, ensuring proper orientation of thermostat. Install housing bolts and tighten in criss-cross pattern to the factory-specified torque; verify the exact value against Aston Martin service documentation.
    Torque spec
    Thermostat Housing Bolt15 Nm (11 lb-ft)
  12. 12
    Reinstall Timing Cover
    Install new timing cover gasket or apply OEM-specified RTV sealant to timing cover sealing surface per factory specification. Carefully position timing cover onto engine, ensuring proper alignment with dowel pins. Install all timing cover bolts in their original positions, starting with center bolts first. Tighten fasteners in spiral pattern from center outward to the factory-specified torque; verify the exact value against Aston Martin service documentation.
  13. 13
    Reinstall Crankshaft Components
    Install harmonic balancer onto crankshaft, aligning with marks made during removal to maintain timing alignment. Install a new crankshaft center bolt (if torque-to-yield) and tighten to the factory-specified torque plus angle using the pulley holder tool; verify the exact torque and angle specification against Aston Martin service documentation before final tightening. Remove timing pins from cylinder heads and crankshaft locking position.
  14. 14
    Verify Timing and Rotate Engine
    Manually rotate crankshaft two complete revolutions clockwise (viewed from front). Verify engine returns to TDC with all timing marks aligned. Reinstall timing pins to confirm - pins should insert freely if timing is correct. If pins do not align, timing is incorrect and must be corrected before proceeding.
    ⚠️Do not proceed if timing cannot be verified. Starting engine with incorrect timing will cause valve-to-piston contact.
  15. 15
    Raise Engine and Reinstall Mounts
    Using engine support fixture, carefully raise front of engine back to original position, aligning engine mount brackets with frame mounts. Install engine mount through-bolts and tighten to the factory-specified torque; verify the exact value against Aston Martin service documentation. Remove engine support fixture.
  16. 16
    Reinstall Accessories and Belt System
    Reinstall air conditioning compressor with all mounting bolts tightened to specification. Reinstall alternator and secure all mounting bolts. Reinstall power steering pump and tighten fasteners. Install new serpentine belt following routing diagram (typically found on radiator support or engine bay label). Install belt tensioner assembly and verify belt tension is correct.
  17. 17
    Reconnect Coolant Hoses
    Reconnect all coolant hoses using labels from disassembly: upper and lower radiator hoses, heater hoses, and bypass hoses. Reconnect all coolant hoses and secure with clamps. The DB9 uses factory spring/constant-tension clamps; reinstall new spring clamps in their original positions. If worm-drive clamps are substituted, tighten snug per clamp manufacturer guidance without crushing the hose.
    Torque spec
    Hose Clamps3 Nm (2 lb-ft)
  18. 18
    Refill Cooling System
    Close radiator drain petcock. Fill cooling system with the factory-specified coolant volume through the radiator fill point and expansion tank, using Aston Martin-approved coolant; verify the exact capacity and coolant specification against factory documentation. Start engine and allow to warm to operating temperature with heater on full hot. Monitor coolant level and add as needed during burping process. Check for leaks around water pump, thermostat housing, and all hose connections. Turn engine off and allow to cool, then verify coolant level is at cold fill mark.

Reassembly

  1. Reinstall lower splash shields and engine cover panels
  2. Reconnect negative battery terminal
  3. Reset any service reminders or adaptation values using diagnostic scanner if applicable
  4. Verify all fasteners have been reinstalled and tools removed from engine bay

Verification

  • Start engine and verify no coolant leaks at water pump, thermostat housing, or hose connections
  • Allow engine to reach operating temperature and verify cooling fan operation
  • Check that heater produces hot air at idle and under load
  • Verify engine operates smoothly without timing-related noise or misfires
  • Recheck coolant level after first heat cycle - top off if needed
  • Monitor coolant level and temperature gauge for first 100 miles of operation
🔧Stuck on this water pump? Take it to The Diag Desk.A human with 20+ years in the bay answers about YOUR Aston Martin within 24 hours — never AI. $25, and you're not charged unless you get an answer.Ask a tech →

More procedures for this vehicle

For shop owners
Want more customers to find you?
We build shop websites with online booking onto your schedule and your own online store.
Talk to the ownerSee what's included
Built by a shop owner. Talk to Chris, not a sales rep.
🔧 Built by master technician Chris Hackleman · Master Technician · 20+ years. Spot an error? Use the Help link above — a human reads every report.
Stuck on this repair? Take it to The Diag Desk — ask a master tech about this exact car → real human answer within 24h, never AI
⚠ STILL BEHIND THE PAYWALL
The 2009 Aston Martin DB9 repair data is incomplete because no one has sponsored it yet. For $99, we generate the full step-by-step procedures, then fact-check them with a second AI pass and your expert review. Your name on every procedure, permanently.
The same data would cost $169/mo from Mitchell1 or $30/year from ALLDATAdiy — and you'd be renting access, not freeing it. Sponsor once, free forever.
Sponsor the Aston Martin DB9 — $99 →
Building an app?
Free API key: 10 requests/day, 100/month, no card required.
Get an API key →
Run a shop?
A free website, SEO and Google reviews with your shop software. Auto Shop Base Professional, $250/mo, with our labor times on every estimate.
See what's included →