cooling
Water Pump
for 2009 Aston Martin DB9 6.0L V12 · RWD
Difficulty
Expert
Time
12.5 h
Tools
12
Steps
18
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
Complete water pump replacement for the 2009 Aston Martin DB9 6.0L V12, requiring removal of front engine accessories, timing cover, and coolant system components.
Warnings
⚠️Allow engine to cool completely (minimum 3 hours) before beginning work. Coolant system operates at high pressure and temperature.
⚠The V12 engine is extremely heavy. Ensure proper engine support before removing motor mounts or suspension components.
⚠Timing alignment is critical. Incorrect installation can cause catastrophic engine damage. Use factory timing pins.
ℹ️This procedure requires disturbing the timing system. Mark all components before disassembly.
⚠OAT coolant is not compatible with conventional green coolant. Do not mix coolant types.
Tools required
Socket set with Torx and E-Torx bitsEssential
Torque wrench (5-100 Nm range)Essential
Engine support fixture or hoistEssential
Serpentine belt tensioner toolEssential
Timing pin set for Aston Martin V12Essential
Pulley holder toolEssential
Gasket scraper (plastic)Essential
Brake cleaner and shop ragsEssential
Marker or paint penEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Water pump assembly × 1 — Use OEM specification
- Water pump gasket × 1 — Use OEM specification
- Thermostat housing gasket × 1 — Use OEM specification
- Timing cover gasket × 1 — Use OEM specification
- Serpentine belt × 1 — Replace if worn
- Engine coolant OAT 50/50 × 11 — 10.50 quarts required
- Hose clamps × 4 — Spring clamps preferred
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Fluids
- coolant — 10.5 qt
Preparation
- Park vehicle on level surface and engage parking brake
- Disconnect negative battery terminal and wait 10 minutes for system discharge
- Remove engine cover panels (secured with Torx fasteners)
- Place drain pan under radiator and open drain petcock to drain coolant completely
- Remove lower splash shields to access underside of engine
- Support engine weight with support fixture from above or hoist with load leveler
Procedure
- 1Remove Front Accessory Drive ComponentsUsing serpentine belt tensioner tool, rotate tensioner clockwise and remove serpentine belt. Remove belt tensioner assembly (note fastener count and positions during removal). Remove power steering pump with lines attached and secure aside with cable ties - do not disconnect hydraulic lines. Remove alternator mounting bolts and position alternator aside without disconnecting wiring harness. Remove air conditioning compressor mounting bolts and secure compressor aside without disconnecting refrigerant lines.
- 2Remove Front Engine Mounts and Lower EngineVerify the correct method to gain front timing cover and water pump access against Aston Martin service documentation before removing any engine mount through-bolts; the DB9 may require cooling pack/front-end removal rather than lowering the engine. Do not lower the engine unless the factory procedure specifies it, and monitor all clearances if engine movement is required.
- 3Drain Remaining Coolant and Disconnect HosesDisconnect upper and lower radiator hoses at engine using hose clamp pliers or appropriate tool. Disconnect heater hoses at engine bay connections. Disconnect coolant bypass hoses connected to water pump and thermostat housing. Label all hoses with marker for correct reinstallation routing. Allow all coolant to drain completely into pan.
- 4Remove Crankshaft Pulley and Harmonic BalancerUsing pulley holder tool to prevent crankshaft rotation, remove center crankshaft bolt (typically very high torque). Remove harmonic balancer using appropriate puller - do not pry or hammer. Mark balancer orientation to crankshaft with paint pen before removal for correct reinstallation timing alignment.
- 5Remove Timing CoverRemove all timing cover fasteners - the Aston Martin V12 timing cover is secured with multiple Torx bolts around perimeter. Note bolt lengths and positions as they vary. Carefully separate timing cover from engine block using plastic gasket scraper at seam. Do not pry against machined sealing surfaces. Remove timing cover and set aside.
- 6Lock Engine at TDC and Verify Timing MarksConfirm against Aston Martin service documentation whether water pump removal requires removal of the timing cover and locking of the valve timing. If the water pump is externally accessible, do NOT disturb timing components. If timing cover removal is genuinely required, rotate crankshaft to TDC cylinder 1, install factory timing pins to lock the camshafts, verify crankshaft keyway alignment, and photograph all timing marks and chain positions before proceeding.
- 7Remove Thermostat HousingRemove thermostat housing bolts and lift housing away from water pump area. Remove old gasket material and inspect thermostat condition. Set aside for reinstallation with new gasket.Torque specThermostat Housing Bolt15 Nm (11 lb-ft)
- 8Remove Water Pump AssemblyRemove all water pump mounting bolts - count and note bolt positions as lengths may vary. Verify the exact water pump bolt count against factory service documentation before ordering fasteners or beginning reassembly. Carefully work water pump free from engine block using gentle rocking motion. Do not pry against sealing surface. Remove water pump and old gasket material.⚠Water pump may be seized to block by corrosion. Use penetrating oil and patience - forcing can crack housing.
- 9Clean and Inspect Mounting SurfacesUsing plastic gasket scraper and brake cleaner, thoroughly clean all gasket surfaces on engine block, timing cover mating area, and thermostat housing mating surface. Inspect water pump mounting surface for corrosion, pitting, or damage. Inspect coolant passages for debris or blockage. Clean passages with brake cleaner and compressed air if available.
- 10Install New Water PumpPosition new water pump gasket on engine block - verify gasket orientation matches coolant passages. Apply thin bead of OEM-approved gasket sealant to gasket if specified by manufacturer. Position new water pump onto block, aligning all bolt holes. Install all water pump bolts finger-tight first to ensure proper alignment. Tighten bolts in criss-cross pattern to the factory-specified torque in progressive stages; verify the exact torque value and bolt count against Aston Martin service documentation before final tightening.Torque specWater Pump Bolts25 Nm (18 lb-ft)
- 11Install Thermostat HousingInstall new thermostat housing gasket. Position thermostat housing onto water pump, ensuring proper orientation of thermostat. Install housing bolts and tighten in criss-cross pattern to the factory-specified torque; verify the exact value against Aston Martin service documentation.Torque specThermostat Housing Bolt15 Nm (11 lb-ft)
- 12Reinstall Timing CoverInstall new timing cover gasket or apply OEM-specified RTV sealant to timing cover sealing surface per factory specification. Carefully position timing cover onto engine, ensuring proper alignment with dowel pins. Install all timing cover bolts in their original positions, starting with center bolts first. Tighten fasteners in spiral pattern from center outward to the factory-specified torque; verify the exact value against Aston Martin service documentation.
- 13Reinstall Crankshaft ComponentsInstall harmonic balancer onto crankshaft, aligning with marks made during removal to maintain timing alignment. Install a new crankshaft center bolt (if torque-to-yield) and tighten to the factory-specified torque plus angle using the pulley holder tool; verify the exact torque and angle specification against Aston Martin service documentation before final tightening. Remove timing pins from cylinder heads and crankshaft locking position.
- 14Verify Timing and Rotate EngineManually rotate crankshaft two complete revolutions clockwise (viewed from front). Verify engine returns to TDC with all timing marks aligned. Reinstall timing pins to confirm - pins should insert freely if timing is correct. If pins do not align, timing is incorrect and must be corrected before proceeding.⚠️Do not proceed if timing cannot be verified. Starting engine with incorrect timing will cause valve-to-piston contact.
- 15Raise Engine and Reinstall MountsUsing engine support fixture, carefully raise front of engine back to original position, aligning engine mount brackets with frame mounts. Install engine mount through-bolts and tighten to the factory-specified torque; verify the exact value against Aston Martin service documentation. Remove engine support fixture.
- 16Reinstall Accessories and Belt SystemReinstall air conditioning compressor with all mounting bolts tightened to specification. Reinstall alternator and secure all mounting bolts. Reinstall power steering pump and tighten fasteners. Install new serpentine belt following routing diagram (typically found on radiator support or engine bay label). Install belt tensioner assembly and verify belt tension is correct.
- 17Reconnect Coolant HosesReconnect all coolant hoses using labels from disassembly: upper and lower radiator hoses, heater hoses, and bypass hoses. Reconnect all coolant hoses and secure with clamps. The DB9 uses factory spring/constant-tension clamps; reinstall new spring clamps in their original positions. If worm-drive clamps are substituted, tighten snug per clamp manufacturer guidance without crushing the hose.Torque specHose Clamps3 Nm (2 lb-ft)
- 18Refill Cooling SystemClose radiator drain petcock. Fill cooling system with the factory-specified coolant volume through the radiator fill point and expansion tank, using Aston Martin-approved coolant; verify the exact capacity and coolant specification against factory documentation. Start engine and allow to warm to operating temperature with heater on full hot. Monitor coolant level and add as needed during burping process. Check for leaks around water pump, thermostat housing, and all hose connections. Turn engine off and allow to cool, then verify coolant level is at cold fill mark.
Reassembly
- Reinstall lower splash shields and engine cover panels
- Reconnect negative battery terminal
- Reset any service reminders or adaptation values using diagnostic scanner if applicable
- Verify all fasteners have been reinstalled and tools removed from engine bay
Verification
- Start engine and verify no coolant leaks at water pump, thermostat housing, or hose connections
- Allow engine to reach operating temperature and verify cooling fan operation
- Check that heater produces hot air at idle and under load
- Verify engine operates smoothly without timing-related noise or misfires
- Recheck coolant level after first heat cycle - top off if needed
- Monitor coolant level and temperature gauge for first 100 miles of operation