Free API
hvac

AC Hose - High Side

for 1994–2007 Dodge Ram 2500 5.9L I6 Cummins Diesel · 4WD
Difficulty
Moderate
Time
1.7 h
Tools
9
Steps
13
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.

Replace the high-pressure AC hose between the compressor and condenser on a 1994-2007 Dodge Ram 2500 with 5.9L Cummins diesel engine, including system evacuation, hose replacement, and recharge.

Warnings

⚠️AC refrigerant must be professionally recovered before opening the system. Releasing refrigerant to atmosphere is illegal and dangerous.
⚠️AC system operates at extremely high pressure. Never loosen fittings with pressure in the system.
⚠Wear safety glasses and gloves when working with AC components. Refrigerant contact causes frostbite.
⚠PAG oil is hygroscopic and absorbs moisture rapidly. Keep new parts sealed until installation.
ℹ️This procedure requires EPA Section 609 certification for AC system service in most jurisdictions.

Tools required

As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.

Parts

As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.

Fluids

  • R-134a refrigerant

Preparation

  1. Park vehicle on level surface and engage parking brake
  2. Allow engine to cool completely if recently operated
  3. Have AC system professionally evacuated and refrigerant recovered using approved equipment
  4. Record the amount of refrigerant removed for proper recharging
  5. Disconnect negative battery cable
  6. Remove engine cover if equipped to access compressor area
  7. Clean area around AC line fittings to prevent contamination

Procedure

  1. 1
    Locate high side AC hose
    Identify the high side AC hose running from the compressor to the condenser (in front of radiator). This is the smaller diameter line and will be warm/hot during operation. Verify compressor mounting location on your specific vehicle before proceeding. Trace the routing to identify mounting brackets and connection points.
  2. 2
    Remove compressor end fitting
    Using a flare nut wrench to prevent rounding, loosen the high side line fitting at the compressor discharge port. Support the line fitting to prevent stress on the compressor port during loosening. Once loose, unthread by hand and carefully pull the line away. Immediately cap or plug the open compressor port to prevent contamination and moisture entry.
    ⚠Use flare nut wrench only - standard wrenches will round off the soft aluminum fittings.
  3. 3
    Remove old O-rings from compressor
    Using an O-ring pick or small hook tool, carefully remove the old O-rings from the compressor discharge port. Inspect the sealing surface for scratches, gouges, or corrosion. Clean the sealing surface with a lint-free cloth. Do not use abrasive materials on aluminum sealing surfaces.
  4. 4
    Release hose from mounting brackets
    Locate and remove any mounting brackets or clips securing the high side hose along its routing path. The Cummins engine typically has 2-3 bracket points along the passenger side frame rail and near the radiator support. Remove bolts or release clips as needed to free the hose.
    Torque spec
    Mounting Bracket Bolts24 Nm (18 lb-ft)
  5. 5
    Disconnect condenser end fitting
    At the condenser inlet (typically located at upper passenger side of condenser), use a flare nut wrench to loosen the high side line fitting. The condenser is behind the grille and may require reaching from above or below depending on model year. Once loose, unthread by hand and remove the hose assembly from vehicle. Cap or plug the condenser port immediately.
  6. 6
    Remove old O-rings from condenser
    Using an O-ring pick, carefully remove the old O-rings from the condenser inlet port. Inspect the sealing surface for damage and clean with a lint-free cloth. Remove caps from new hose assembly and inspect fittings to ensure they are clean and undamaged.
  7. 7
    Prepare new O-rings
    Remove new O-rings from sealed packaging. Coat each O-ring lightly with fresh PAG oil compatible with R-134a systems. Install new O-rings on both ends of the new hose assembly, seating them properly in the grooves. Do not overstretch or twist O-rings during installation.
    ⚠Use only fresh PAG oil from a sealed container. Contaminated or moisture-laden oil will damage the AC system.
  8. 8
    Add PAG oil to system
    Add the appropriate amount of fresh PAG oil to compensate for oil lost with the old hose. Typically 1-2 ounces total should be added through the compressor port or poured into the new hose before connection. Refer to total system capacity and amount recovered.
  9. 9
    Install hose at condenser
    Route the new high side hose to the condenser inlet, ensuring it follows the same path as the original and is not kinked or stressed. Thread the fitting by hand until seated, then use a flare nut wrench to tighten to specification. Support the condenser to prevent stress during tightening.
    Torque spec
    AC Line Fittings20 Nm (15 lb-ft)
  10. 10
    Secure hose in mounting brackets
    Install the hose into all mounting brackets along its routing path. Ensure the hose is properly supported and has no contact with sharp edges, hot exhaust components, or moving parts. The hose should have slight slack to allow for engine movement without stress. Install and tighten mounting bracket bolts if removed.
    Torque spec
    Mounting Bracket Bolts24 Nm (18 lb-ft)
  11. 11
    Connect hose at compressor
    Route the compressor end of the hose into position, ensuring no kinks or tight bends. Thread the fitting onto the compressor discharge port by hand until seated, then use a flare nut wrench to tighten to specification. Do not overtighten as this will damage the aluminum threads.
    ⚠Overtightening AC fittings will strip aluminum threads. Stop at specified torque.
    Torque spec
    AC Line Fittings20 Nm (15 lb-ft)
  12. 12
    Vacuum and leak test system
    Connect AC service equipment to the high and low side service ports. Evacuate the system to at least 29 inches of mercury vacuum for minimum 30 minutes (45 minutes preferred for moisture removal). Monitor vacuum gauge for 10 minutes after pump stops - vacuum should hold steady indicating no leaks. If vacuum drops, locate and repair leak before proceeding.
  13. 13
    Recharge AC system
    With system still under vacuum, charge the AC system with the amount of R-134a refrigerant recorded during recovery (verify exact charge amount on the underhood AC label for this specific vehicle, typically around 32-38 ounces for this system). Follow AC machine instructions for proper charging procedure. Do not overcharge the system.

Reassembly

  1. Reinstall engine cover if equipped
  2. Reconnect negative battery cable
  3. Double-check all AC line fittings are properly tightened to specification
  4. Verify no tools or parts are left in engine compartment

Verification

  • Start engine and turn AC to maximum cold with blower on high
  • Allow system to run for 5 minutes and verify cold air discharge from vents
  • Check compressor clutch engages and cycles normally
  • Inspect all AC line connections for signs of oil leakage indicating refrigerant loss
  • Use AC leak detector or soap solution on all disturbed fittings to verify no leaks
  • Monitor AC performance over next few days - system should maintain full cooling capacity
  • Verify high side pressure reaches 200-250 PSI at idle with ambient temperature of 70-90°F (readings vary with temperature)
🔧Stuck on this ac hose - high side? Take it to The Diag Desk.A human with 20+ years in the bay answers about YOUR Dodge within 24 hours — never AI. $25, and you're not charged unless you get an answer.Ask a tech →

More procedures for this vehicle

For shop owners
Want more customers to find you?
We build shop websites with online booking onto your schedule and your own online store.
Talk to the ownerSee what's included
Built by a shop owner. Talk to Chris, not a sales rep.
🔧 Built by master technician Chris Hackleman · Master Technician · 20+ years. Spot an error? Use the Help link above — a human reads every report.
Stuck on this repair? Take it to The Diag Desk — ask a master tech about this exact car → real human answer within 24h, never AI
🔓 LIBERATED FOREVER
The 1994–2007 Dodge Ram 2500 5.9L I6 Cummins Diesel repair data is free for every DIYer and shop on earth, permanently, because Timmehster paid $99 to unlock it.
Mitchell1 charges $169/mo for this. ALLDATAdiy charges $30/yr per vehicle. Open Labor Project is free permanently, because of community sponsors like Timmehster.
Free another vehicle →
Building an app?
Free API key: 10 requests/day, 100/month, no card required.
Get an API key →
Run a shop?
A free website, SEO and Google reviews with your shop software. Auto Shop Base Professional, $250/mo, with our labor times on every estimate.
See what's included →