exhaust
Exhaust Manifold Studs
for 1994–2007 Dodge Ram 2500 5.9L I6 Cummins Diesel · 4WD
Difficulty
Advanced
Time
4.0 h
Tools
15
Steps
12
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
This procedure covers removal and replacement of broken or damaged exhaust manifold studs on the 5.9L Cummins diesel engine, including extraction techniques and proper installation.
Warnings
⚠️Allow engine and exhaust system to cool completely before beginning work. Exhaust components can cause severe burns for hours after engine shutdown.
⚠Broken studs may require drilling into the cylinder head. Take extreme care to drill perfectly straight and stop before breaking through into coolant passages.
⚠Metal shavings from drilling can fall into intake and exhaust ports. Cover all openings and use magnetic pickup tools.
ℹ️This job assumes at least one manifold stud is broken flush or below the head surface. If studs protrude, removal is significantly easier.
Tools required
Torque wrench (ft-lb and in-lb)Essential
Left-hand drill bit setEssential
Stud extractor setEssential
3/8" drive ratchet and socket setEssential
1/2" drive breaker barEssential
Center punchEssential
Electric drillEssential
Penetrating oilEssential
Anti-seize compoundEssential
Thread chaser M10x1.5Essential
Oxygen sensor socketEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Exhaust manifold stud kit × 1 — Dorman 03412 or ARP 247-5401
- Exhaust manifold gasket × 1 — Use OEM specification
- Exhaust flange gasket × 1 — Use OEM specification
- Oxygen sensor (if damaged) × 1 — Use OEM specification
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Preparation
- Park vehicle on level ground and allow engine to cool completely (minimum 4 hours)
- Disconnect both battery cables, negative first
- Raise and support front of vehicle on jack stands if working from below
- Remove engine cover if equipped
- Spray all exhaust fasteners with penetrating oil and allow to soak 30+ minutes
Procedure
- 1Remove exhaust downpipeRemove exhaust flange bolts connecting the exhaust brake/downpipe to the exhaust manifold. Support downpipe weight and separate from manifold. Hang downpipe with wire to prevent strain on the system.Torque specO2 Sensor45 Nm (33 lb-ft)Exhaust Flange Bolt45 Nm (33 lb-ft)
- 2Remove exhaust manifold heat shieldRemove heat shield mounting bolts from top and sides of exhaust manifold. Carefully remove heat shield, noting position of any spacers or washers. Set aside for reinstallation.Torque specHeat Shield Bolts10 Nm (7 lb-ft)
- 3Remove exhaust manifoldRemove all accessible exhaust manifold nuts. Verify the exact number of studs/bolts securing the manifold to the cylinder head against the service manual for your specific 5.9L Cummins (12-valve vs 24-valve). Work from center outward in alternating pattern to prevent warping. Carefully pull manifold away from head. If stuck, gently tap with rubber mallet. Do not pry against sealing surface.⚠Manifold may be extremely heavy. Use proper lifting technique or get assistance to avoid dropping it.Torque specManifold Nuts34 Nm (25 lb-ft)
- 4Assess broken stud conditionClean area around broken studs with wire brush. Determine if broken studs are flush, recessed, or protruding from cylinder head surface. Mark center of each broken stud with center punch. Cover intake and exhaust ports with clean rags or tape to prevent debris entry.⚠Accurate center punching is critical. Off-center drilling will damage threads and may require helicoil installation.
- 5Drill pilot holes in broken studsUsing left-hand drill bit (start with 1/8" size), carefully drill into center of broken stud. Keep drill perfectly perpendicular to head surface. Drill slowly with light pressure. Often the reverse rotation of left-hand bit will catch and unscrew the broken stud. If stud does not extract, progressively increase drill bit size up to 5/16", staying centered.⚠️Do not drill deeper than 1 inch or you risk breaking through into coolant passages. Measure and mark drill bit depth.⚠Use cutting oil and drill at low speed to prevent hardening the stud material from heat.
- 6Extract remaining stud materialInsert appropriate size stud extractor (easy-out) into drilled hole. Tap gently with hammer to seat extractor teeth. Using wrench or tap handle, turn extractor counterclockwise with steady pressure. If stud will not move, apply heat to surrounding area with propane torch (not oxy-acetylene) and retry. If extractor breaks, drill it out carefully with carbide bit.⚠Extractors are extremely hard and brittle. Excessive force will break them off, creating a more difficult situation.
- 7Clean and chase threadsOnce all broken studs are removed, use shop vacuum to remove all metal shavings from area. Verify the correct thread size against the service manual, then run the matching thread chaser through each stud hole by hand to clean and verify threads. Chase should turn smoothly through entire depth. Clean cylinder head mating surface with plastic scraper and brake cleaner. Remove all old gasket material.ℹ️If threads are damaged and chaser will not turn freely, cylinder head may need helicoil installation or machine work.
- 8Install new exhaust manifold studsApply small amount of anti-seize compound to threads of new studs (not the sealing portion that goes into head). Thread studs into cylinder head by hand, turning until they bottom out or reach specified depth per stud kit instructions. Use two nuts locked together on stud end to achieve final torque if required by stud manufacturer. Studs should be installed to equal height.⚠Do not apply anti-seize to portion of stud that enters cylinder head on through-bolt style studs. Only apply to threads where nut will engage.
- 9Install new exhaust manifold gasketPosition new exhaust manifold gasket over studs on cylinder head. Ensure gasket is oriented correctly with any embossed markings facing outward. Verify all port openings align properly with head and manifold.ℹ️Do not use additional gasket sealer or RTV on exhaust manifold gasket. It should be installed dry.
- 10Install exhaust manifoldCarefully lift exhaust manifold into position, aligning all studs through manifold holes. Start all manifold nuts by hand to ensure proper thread engagement. Apply anti-seize compound to nut threads before installation. Tighten nuts in alternating pattern from center outward in stages, working up to the manufacturer's final torque specification (approximately 32 ft-lb for 5.9L Cummins — verify against the service manual).⚠Uneven tightening can warp manifold and cause exhaust leaks. Follow proper tightening sequence.Torque specManifold Nuts34 Nm (25 lb-ft)
- 11Reinstall heat shieldPosition heat shield over exhaust manifold, aligning all mounting holes. Install heat shield bolts and tighten to specification. Ensure shield is properly seated and not binding on any components.Torque specHeat Shield Bolts10 Nm (7 lb-ft)
- 12Reconnect exhaust downpipeInstall new exhaust flange gasket between manifold and downpipe. Align downpipe to manifold flange. Apply anti-seize to flange bolt threads and install bolts finger-tight. Tighten flange bolts in cross pattern to specification.Torque specExhaust Flange Bolt45 Nm (33 lb-ft)O2 Sensor45 Nm (33 lb-ft)
Reassembly
- Remove all rags or tape used to cover intake and exhaust ports
- Reinstall engine cover if equipped
- Reconnect battery cables, positive first, then negative
- Lower vehicle from jack stands if raised
Verification
- Start engine and listen for exhaust leaks at manifold and flange connections
- Inspect all connections for visible exhaust gas escape while engine is running
- Allow engine to reach operating temperature and recheck for leaks
- Verify no unusual noises or vibrations from exhaust system
- After first heat cycle, consider retorquing manifold nuts when engine is cold (optional but recommended for high-performance applications)
Related trouble codes on this vehicle
Codes that commonly send this job to the bay — tap one for symptoms, causes, and diagnostic steps.
P0013Exhaust Camshaft Position Actuator Circuit/Open Bank 1P0014Exhaust Camshaft Position Timing Over-Advanced Bank 1P0023Exhaust Camshaft Position Actuator Circuit/Open Bank 2P0024Exhaust Camshaft Position Timing Over-Advanced Bank 2P0078Exhaust Valve Control Solenoid Circuit (Bank 1)P0079Exhaust Valve Control Solenoid Circuit Low (Bank 1)P0080Exhaust Valve Control Solenoid Circuit High (Bank 1)P0084Exhaust Valve Control Solenoid Circuit (Bank 2)P0105Manifold Absolute Pressure/BARO CircuitP0400Exhaust Gas Recirculation (EGR) FlowP0407Exhaust Gas Recirculation Sensor B Circuit LowP0470Exhaust Pressure Sensor Malfunction
Chasing one of these codes and not sure which part is guilty? Ask a master mechanic about YOUR car →