engine
Intake Manifold
for 1994–2007 Dodge Ram 2500 5.9L I6 Cummins Diesel · 4WD
Difficulty
Moderate
Time
4.0 h
Tools
10
Steps
15
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
This procedure covers removal and replacement of the intake manifold on the 5.9L Cummins diesel engine, including all related components and proper sealing procedures.
Warnings
⚠️Allow engine to cool completely before starting work to avoid severe burns from coolant and components.
⚠Diesel fuel will be present in fuel rail. Have absorbent materials ready and work in well-ventilated area.
⚠Do not use excessive force on intake manifold bolts as the cylinder head is cast iron and threads can strip.
ℹ️This is a dry intake manifold on the Cummins diesel - no coolant passages are present in the manifold itself.
Tools required
Metric socket set (8mm-19mm)Essential
Torque wrench (5-50 Nm range)Essential
Flathead screwdriverEssential
Pick set or gasket scraperEssential
Shop ragsEssential
Brake cleaner or degreaserEssential
Ratchet extensions (3" and 6")Essential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Intake manifold gasket × 1 — Use OEM or Fel-Pro MS 96410
- Valve cover gasket (if disturbed) × 1 — Use OEM specification
- Fuel rail O-rings × 1 — Use OEM specification
- Throttle body gasket × 1 — Use OEM specification
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Preparation
- Park vehicle on level ground and allow engine to cool completely (minimum 2 hours)
- Disconnect both negative and positive battery cables to prevent electrical shorts
- Remove engine cover if equipped
- Label all electrical connectors, vacuum lines, and fuel lines with tape for correct reassembly
- Have a camera or phone ready to photograph routing of wiring and hoses before removal
Procedure
- 1Disconnect Air Intake SystemLoosen clamps on air intake tube from turbocharger to air filter housing. Remove complete air intake assembly including resonator box. Disconnect intake air temperature sensor connector if equipped. Set aside entire assembly to provide working room.
- 2Remove Throttle Linkage and CablesOn mechanically-governed engines (1994-2002), disconnect throttle cable from throttle lever on injection pump. On 2003-2007 common-rail engines the throttle is electronic (APPS) with no mechanical cable at the pump. Remove cruise control cable if equipped. Unbolt cable bracket from intake manifold. Tag position of any adjustment points before removal for easier reinstallation.
- 3Disconnect Fuel System ComponentsOn the Cummins the fuel injection system does not mount to the intake manifold and generally does not require disassembly for intake removal. Only disconnect fuel-related components if they physically obstruct manifold removal, and cap any opened lines to prevent contamination.⚠Residual fuel pressure may be present. Have shop rags ready to catch any fuel spray when disconnecting lines.Torque specElectrical Connector Bolts7 Nm (5 lb-ft)Fuel Rail Bolts12 Nm (9 lb-ft)
- 4Remove Valve CoverValve cover removal is generally not required for intake manifold service on the Cummins. Skip unless a component physically obstructs manifold access.
- 5Disconnect PCV and Breather SystemsThe Cummins uses a crankcase breather/vent tube, not a PCV valve. Disconnect the breather/CDR vent tube if it obstructs the intake, keeping hardware organized for reinstallation.Torque specPCV Valve8 Nm (6 lb-ft)
- 6Disconnect Sensors and ElectricalDisconnect the intake air grid heater electrical connections (standard on this engine) — note these are high-current cables, so ensure battery is disconnected first. Remove any temperature sensors mounted in the intake and unbolt any wiring harness brackets attached to it. Ensure all electrical connections are clear of the manifold removal path.Torque specSensor Mounting Bolts11 Nm (8 lb-ft)
- 7Remove Throttle Body (if applicable)The Cummins diesel has no throttle body; skip this step (a throttle body gasket is not required for this engine).Torque specThrottle Body Bolts10 Nm (7 lb-ft)
- 8Remove Intake Manifold Mounting HardwareBeginning from the outside bolts and working toward center, loosen all intake manifold bolts in a crisscross pattern. Remove all bolts completely and set aside. Check for any hidden brackets, ground straps, or support brackets that may still be attached.
- 9Remove Intake ManifoldCarefully lift intake manifold straight up and away from cylinder head. If manifold is stuck to gasket, gently tap with rubber mallet or use plastic pry tool at thick sections only. Do not pry on gasket surfaces. Once free, inspect manifold ports for carbon buildup or debris.⚠Manifold is heavy and awkward. Use assistant or support as needed to prevent dropping and damaging gasket surfaces.
- 10Clean Gasket SurfacesRemove all old gasket material from cylinder head and intake manifold mating surfaces using plastic scraper or non-metallic brush. Clean surfaces thoroughly with brake cleaner and lint-free shop rags. Inspect for any damage, warping, or deep scratches. Surface must be completely clean and dry before new gasket installation.⚠Do not use wire wheels or aggressive metallic scrapers on aluminum surfaces as this will cause damage and leaks.ℹ️Cover open intake ports on cylinder head with clean rags to prevent debris from entering engine.Torque specGasket Surface Bolts20 Nm (15 lb-ft)
- 11Install New Gasket and Position ManifoldPosition new intake manifold gasket on cylinder head, ensuring all bolt holes and ports align correctly. Do not use sealant unless specifically required by gasket manufacturer. Carefully lower intake manifold onto gasket, aligning all ports and bolt holes. Ensure gasket does not shift during installation.
- 12Install and Torque Intake Manifold BoltsInstall all intake manifold bolts finger-tight, ensuring even pressure on gasket. Following manufacturer's sequence (typically center bolts first, then working outward in crisscross pattern), torque all bolts to specification. Perform final torque pass in same sequence to ensure even clamping force.⚠Over-torquing can crack manifold or strip threads in cylinder head. Under-torquing will cause vacuum leaks and poor engine performance.Torque specIntake Manifold Bolt25 Nm (18 lb-ft)
- 13Reinstall Throttle Body and SensorsReinstall all sensors removed earlier, applying anti-seize to threads only if specified. Reconnect all electrical connectors, including the grid heater feed, ensuring they seat securely.Torque specThrottle Body Bolts10 Nm (7 lb-ft)Sensor Mounting Bolts11 Nm (8 lb-ft)
- 14Reinstall Fuel SystemReinstall any fuel-related components that were disturbed for access, torquing fittings/lines to specification. Note the Cummins injectors and fuel rail do not mount to the intake manifold.Torque specFuel Rail Bolts12 Nm (9 lb-ft)Electrical Connector Bolts7 Nm (5 lb-ft)
- 15Reinstall Valve Cover and AccessoriesReinstall valve cover with new gasket if it was disturbed, torquing cover bolts in the proper sequence. Reinstall breather/vent tube components. Reconnect throttle linkage and cable brackets where applicable. Install air intake system and tighten all clamps securely.Torque specPCV Valve8 Nm (6 lb-ft)Sensor Mounting Bolts11 Nm (8 lb-ft)
Reassembly
- Verify all electrical connectors are fully seated and locked
- Ensure all vacuum lines and breather hoses are properly connected and routed away from hot components
- Double-check that no tools or rags were left in engine compartment
- Reconnect battery cables (positive first, then negative)
Verification
- Turn ignition to ON position without starting engine and check for fuel leaks around fuel rail and injectors
- Start engine and listen for any vacuum leaks or unusual noises from intake area
- Allow engine to reach operating temperature and verify smooth idle with no misfires or hesitation
- Check for any fuel, oil, or exhaust leaks around intake manifold gasket areas
- Test drive vehicle and verify normal throttle response and power delivery
- Recheck intake manifold bolt torque after first heat cycle (20-50 miles) to ensure gasket has seated properly
Related trouble codes on this vehicle
Codes that commonly send this job to the bay — tap one for symptoms, causes, and diagnostic steps.
P0010Intake Camshaft Position Actuator Circuit/Open Bank 1P0011Intake Camshaft Position Timing Over-Advanced Bank 1P0020Intake Camshaft Position Actuator Circuit/Open Bank 2P0021Intake Camshaft Position Timing Over-Advanced Bank 2P0075Intake Valve Control Solenoid Circuit (Bank 1)P0076Intake Valve Control Solenoid Circuit Low (Bank 1)P0081Intake Valve Control Solenoid Circuit (Bank 2)P0082Intake Valve Control Solenoid Circuit Low (Bank 2)P0095Intake Air Temperature Sensor 2 CircuitP0096Intake Air Temperature Sensor 2 Circuit Range/PerformanceP0105Manifold Absolute Pressure/BARO CircuitP0110Intake Air Temperature (IAT) Sensor 1 Circuit
Chasing one of these codes and not sure which part is guilty? Ask a master mechanic about YOUR car →