engine
Intercooler
for 1994–2007 Dodge Ram 2500 5.9L I6 Cummins Diesel · 4WD
Difficulty
Moderate
Time
2.9 h
Tools
9
Steps
13
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
This procedure covers removal and replacement of the intercooler assembly on the 5.9L Cummins diesel engine, including charge air piping and mounting hardware.
Warnings
⚠Allow engine to cool completely before beginning work. Charge air system may retain heat and residual pressure.
⚠Intercooler may contain oil residue from turbocharger blow-by. Have drain pan ready.
ℹ️Inspect charge air piping boots for cracking or deterioration during removal. Replace if damaged.
Tools required
Socket set (metric and SAE)Essential
Torque wrench (5-50 Nm range)Essential
Flathead screwdriverEssential
Razor blade or gasket scraperEssential
Brake cleanerEssential
Shop ragsEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Intercooler assembly × 1 — Use OEM specification or aftermarket equivalent
- Charge pipe clamps × 4 — T-bolt style clamps
- Intercooler mounting gaskets × 2 — Use OEM specification
- Intercooler mounting hardware kit × 1 — Bolts and brackets if corroded
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Preparation
- Park vehicle on level surface and set parking brake
- Disconnect negative battery cable
- Allow engine to cool completely (minimum 2 hours)
- Remove front bumper cover to access intercooler area
- Mark or photograph charge pipe routing and sensor locations for reassembly reference
Procedure
- 1Disconnect intake air temperature sensorLocate the intake air temperature sensor. Disconnect the electrical connector by pressing the release tab. If the sensor needs removal, unthread it from its port using the appropriate wrench.Torque specSensor Mounting Bolts11 Nm (8 lb-ft)Electrical Connector Bolts7 Nm (5 lb-ft)
- 2Remove charge air pipes from intercoolerLoosen the charge pipe clamps at the intercooler inlet (from turbocharger) and outlet (to intake manifold) connections. Use hose clamp pliers if equipped with spring clamps, or socket/screwdriver for worm-gear clamps. Carefully twist and pull charge pipes off intercooler connections. Some oil residue is normal.ℹ️Mark pipe orientation before removal to ensure correct reinstallationTorque specCharge Pipe Clamps4 Nm (3 lb-ft)
- 3Drain intercooler residual oilTip the intercooler forward and drain any accumulated oil into a drain pan. This oil accumulation is normal from turbocharger blow-by. Excessive oil (more than 2-3 ounces) may indicate turbocharger seals require attention.
- 4Remove intercooler mounting boltsRemove the intercooler mounting bolts securing the unit to the radiator support brackets. Typical configuration includes 4-6 mounting bolts at the top and bottom brackets. Support the intercooler while removing the final bolts.⚠Intercooler weighs approximately 15-20 lbs. Support during removal to prevent dropping.Torque specIntercooler Mounting Bolts15 Nm (11 lb-ft)
- 5Remove intercooler assemblyCarefully maneuver the intercooler out through the front of the vehicle after removing the grille. May require slight angling or tilting to clear the radiator support and other components. Inspect mounting brackets and rubber isolators for damage. May require slight angling or tilting to clear radiator support and other components. Inspect mounting brackets and rubber isolators for damage.
- 6Inspect and clean mounting surfacesClean the charge pipe boot sealing surfaces on the intercooler inlet and outlet using a shop rag and brake cleaner. Remove any debris, oil residue, and corrosion. Inspect mounting brackets for cracks or damage. Check intercooler fins for damage and debris. Inspect mounting brackets for cracks or damage. Check intercooler fins for damage and debris.ℹ️Do not use aggressive abrasives that could damage aluminum surfacesTorque specGasket Surface Bolts20 Nm (15 lb-ft)
- 7Prepare new intercoolerUnpack new intercooler and verify all mounting points match original. Verify the rubber isolators/mounts are in good condition and transfer them or install new ones if applicable to your specific model year. Verify all connection points are clean and free from shipping debris.
- 8Install intercooler assemblyCarefully position new intercooler into mounting location, aligning mounting holes with brackets. Thread mounting bolts by hand to ensure proper alignment before tightening. Install all mounting bolts finger-tight first.
- 9Torque intercooler mounting boltsUsing torque wrench, tighten intercooler mounting bolts in a cross-pattern to ensure even seating. Start with lower bolts, then upper bolts. Apply specified torque for mounting bolt size and location.⚠Over-torquing can crack aluminum mounting ears. Use accurate torque wrench.Torque specIntercooler Mounting Bolts15 Nm (11 lb-ft)
- 10Reconnect charge air pipesApply thin film of clean engine oil to inside of charge pipe boots for easier installation. Slide charge pipes onto intercooler inlet and outlet connections, ensuring full seating. Position clamps over boot beads before tightening.
- 11Secure charge pipe clampsTighten all charge pipe clamps to specification using torque wrench. Verify pipes cannot be twisted or pulled off by hand after tightening. Ensure clamps are positioned over raised bead areas on connections.⚠Under-torqued clamps will allow boost leaks. Over-torquing can damage boots.Torque specCharge Pipe Clamps4 Nm (3 lb-ft)
- 12Reinstall sensors and connectorsReinstall the intake air temperature sensor if removed, threading it into its port and torquing to specification. Reconnect the electrical connector, ensuring positive lock engagement. Verify the connector is fully seated. Reconnect electrical connector, ensuring positive lock engagement. Verify connector is fully seated.Torque specSensor Mounting Bolts11 Nm (8 lb-ft)Electrical Connector Bolts7 Nm (5 lb-ft)
- 13Reinstall front bumper coverReinstall the front bumper/valance and grille, aligning all mounting points and fasteners. Secure all bolts and clips. Verify headlight and grille alignment.
Reassembly
- Reconnect negative battery cable
- Double-check all clamp connections for proper tightness
- Verify no tools or parts left in engine compartment
- Check that all electrical connectors are fully seated and locked
Verification
- Start engine and allow to idle. Listen for air leaks (hissing sounds) around intercooler connections
- Rev engine to 2000 RPM and verify no boost leaks audible
- Test drive vehicle and verify normal boost pressure operation
- Recheck all clamp tightness after first 50 miles of operation
- Monitor intake air temperatures to verify intercooler is functioning properly