engine
Main Bearings
for 1994–2007 Dodge Ram 2500 5.9L I6 Cummins Diesel · 4WD
Difficulty
Expert
Time
18.4 h
Tools
18
Steps
23
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
Complete replacement of main bearings on the 5.9L Cummins diesel engine, requiring engine removal or cab lift and extensive disassembly.
Warnings
⚠️This engine weighs over 1000 lbs. Ensure engine hoist and all lifting equipment are rated appropriately and in good condition.
⚠️Do not work under engine supported only by hoist. Use proper engine stand once engine is removed.
⚠Main bearing cap bolts are torque-to-yield and MUST be replaced. Reusing old bolts can result in catastrophic engine failure.
⚠Measure all crankshaft journals and bearing clearances carefully. Improper clearances will cause immediate bearing failure.
⚠Keep all bearing caps in order and oriented correctly. Installing caps backward or out of sequence will destroy the engine.
ℹ️This procedure assumes engine removal. Some technicians prefer cab lift on these trucks, which may reduce labor time.
ℹ️Verify crankshaft journal condition before installing new bearings. Scored journals require crankshaft grinding and undersize bearings.
Tools required
Engine hoist and load levelerEssential
Engine standEssential
Torque wrench (0-150 lb-ft range)Essential
Dial bore gaugeEssential
Micrometer setEssential
Transmission jackEssential
Socket set (metric and standard)Essential
Oil filter wrenchEssential
Drain pan (15+ quart capacity)Essential
Rubber malletEssential
Gasket scraperEssential
Brake cleaner and shop ragsEssential
Assembly lube for bearingsEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Main bearing set (standard or appropriate undersize) × 1 — Use OEM specification
- Thrust bearing set × 1 — Use OEM specification
- Main bearing cap bolts (torque-to-yield) × 14 — Use OEM specification
- Oil pan gasket × 1 — Use OEM specification
- Front cover gasket × 1 — Use OEM specification
- Rear main seal × 1 — Use OEM specification
- Oil pump pickup tube O-ring × 1 — Use OEM specification
- Oil drain plug crush washer × 1 — Use OEM specification
- Engine oil filter × 1 — Use OEM specification
- RTV silicone sealant (Mopar or equivalent) × 1 — Use OEM specification
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Fluids
- 15W-40 diesel engine oil — 12 qt
- Mopar ATF+4 (if transmission removed) — 14 qt
- Ethylene glycol 50/50 coolant — 28 qt
Preparation
- Park vehicle on level surface and engage parking brake
- Disconnect both battery cables, negative first
- Drain engine oil completely and remove oil filter
- Drain cooling system at radiator petcock and lower hose
- Remove hood and mark hinge locations for reinstallation
- Remove air intake system from air filter housing to turbocharger inlet
- Label and disconnect all wiring harnesses from engine
- Remove coolant hoses from engine including radiator hoses and heater hoses
- Disconnect fuel supply and return lines at fuel filter housing
- Remove radiator, fan shroud, and cooling fan assembly
- Discharge AC system and disconnect AC lines from compressor
- Disconnect exhaust downpipe from turbocharger outlet
- Remove transmission inspection cover and mark flexplate-to-torque converter relationship
- Support transmission with transmission jack
- Remove bellhousing-to-engine bolts and separate transmission slightly
- Remove front driveshaft and mark yoke orientation
- Attach engine hoist with proper lifting chains to engine lift brackets
- Remove engine mount bolts and verify all connections are disconnected
Procedure
- 1Remove Engine from VehicleWith engine hoist properly attached and transmission supported, carefully lift engine while tilting slightly to clear transmission input shaft. Once clear of frame mounts, lift engine high enough to clear radiator support and carefully move forward out of engine bay. Use load leveler to maintain balance during removal.
- 2Mount Engine on StandLower engine onto engine stand and secure using bellhousing bolt holes. Ensure engine is securely mounted before releasing hoist. Position engine vertically with oil pan facing up for easier disassembly.
- 3Remove Oil Pan and Pickup TubeRemove all oil pan bolts in reverse of tightening sequence. Carefully separate oil pan from block using gasket scraper if necessary. Remove oil pump pickup tube mounting bolts and extract pickup tube with O-ring. Inspect pickup screen for debris.Torque specOil Pan Bolt12 Nm (9 lb-ft)Oil Pump Pickup Tube12 Nm (9 lb-ft)
- 4Remove Timing Cover and AccessoriesRemove harmonic balancer using puller tool. Remove timing cover bolts and carefully pry cover away from block. Remove oil pump drive gear. Mark timing gear positions before removal. This provides access to front main bearing cap.⚠Do not use impact tools on harmonic balancer bolt as this can damage crankshaft threads or keyway.
- 5Remove Flywheel or FlexplateIf not already removed, mark flywheel/flexplate position relative to crankshaft flange. Remove all flywheel bolts in star pattern. Use flywheel holder or have assistant hold crankshaft to prevent rotation. Lift flywheel off crankshaft flange.Torque specFlywheel Bolts95 Nm (70 lb-ft)
- 6Inspect and Mark Bearing CapsVerify all main bearing caps are numbered from front (1) to rear (7). Note orientation arrows on caps - they must face forward. Check for any existing markings indicating cap-to-block relationship. Photograph or document existing positions before removal.⚠️Main bearing caps are line-bored as a matched set with the block. Installing caps in wrong position or orientation will cause immediate engine seizure.
- 7Remove Main Bearing Cap BoltsWorking from front to rear, loosen main bearing cap bolts gradually in multiple passes. Start with outer caps (1 and 7), then work toward center. Loosen each cap 1/4 turn at a time to avoid distorting crankshaft. Once all bolts are loose, remove them completely. These are torque-to-angle bolts; verify Cummins reuse policy before reinstalling.⚠Do not loosen cap bolts unevenly as this can bend the crankshaft or cause binding.Torque specMain Bearing Cap Bolts75 Nm (55 lb-ft)
- 8Remove Main Bearing CapsCarefully lift each main bearing cap straight up. Some caps may require light tapping with rubber mallet. Keep caps in order on workbench. Do not allow caps to fall or be dropped as this damages machined surfaces. Note position of thrust bearing on center main cap (#4).
- 9Remove CrankshaftWith all caps removed, carefully lift crankshaft straight out of block. This requires two people due to weight (approximately 130 lbs). Place crankshaft on padded surface or crankshaft stand. Do not drag crankshaft across block surface.⚠️Crankshaft is extremely heavy. Use proper lifting technique and have adequate assistance to avoid injury.
- 10Remove Old Bearings and Clean SurfacesRemove upper bearing shells from block saddles and lower shells from caps. Note position of bearing tangs in locating slots. Clean all bearing surfaces in block and caps thoroughly with brake cleaner. Inspect for scoring, discoloration, or damage. Clean crankshaft journals with brake cleaner and inspect for scoring, taper, or out-of-round condition.
- 11Measure Crankshaft JournalsUsing micrometer, measure each main bearing journal diameter at multiple points (90-degree intervals and along journal length). Record all measurements. Compare to service specifications (verify standard main journal diameter against Cummins service manual). Check for taper (difference in diameter along journal) and out-of-round (difference around journal). Maximum acceptable variation is 0.0005 inch. If journals are worn beyond specification, crankshaft requires grinding and undersize bearings.⚠Crankshaft with scored or out-of-specification journals will cause immediate bearing failure even with new bearings.
- 12Measure Bearing BoresInstall bearing caps in correct positions without bearings and torque bolts to specification using old bolts (new TTY bolts will be used for final assembly). Using dial bore gauge, measure each main bearing bore diameter. Record measurements. Bores should be within 0.001 inch of each other. Remove caps after measuring.Torque specMain Bearing Cap Bolts75 Nm (55 lb-ft)
- 13Install Upper Bearing ShellsApply thin coat of assembly lube to bearing backs. Install upper bearing shells (with oil holes) into block saddles, ensuring bearing tang engages locating slot. Do not force bearings. Wipe assembly lube from bearing surface and apply fresh lube to bearing face. Install all seven upper bearings. Install thrust bearing halves on center main (#4) with oil grooves facing out.
- 14Install Crankshaft and Check ClearancesCarefully lower crankshaft into block, aligning journals with bearing shells. Install lower bearing shells (without oil holes) into main caps with assembly lube on backs and faces. Place Plastigage strips across each crankshaft journal parallel to crankshaft centerline. Install bearing caps in correct order and orientation. Install new main cap bolts finger-tight, then torque to the Cummins-specified initial value in sequence from center outward (verify torque spec against Cummins service manual). Do NOT rotate crankshaft with Plastigage installed.⚠Do not apply final torque angle at this stage - this is only for clearance checking.Torque specMain Bearing Cap Bolts75 Nm (55 lb-ft)
- 15Measure Bearing ClearancesCarefully remove main caps without rotating crankshaft. Check Plastigage width on each journal using scale on Plastigage envelope. Specification per Cummins service manual (verify main bearing clearance values against Cummins documentation). Record all clearances. If clearances are too tight, check for debris or incorrect bearing selection. If too loose, verify crankshaft journal diameter or select different bearing size. Remove all Plastigage material completely.⚠️Bearing clearances outside specification will cause bearing failure and engine damage. Do not proceed without correct clearances.
- 16Check Crankshaft EndplayWith clearances verified, reinstall main caps with new assembly lube on bearing faces. Install new main bearing cap bolts. Torque to the Cummins-specified initial value in sequence from center outward, then apply the specified torque angle in same sequence (verify torque and angle against Cummins service manual). Using dial indicator on crankshaft snout, pry crankshaft fully forward and zero indicator. Pry crankshaft fully rearward and read endplay. Specification per Cummins service manual (verify crankshaft endplay range against Cummins documentation). Adjust with different thickness thrust bearings if needed.Torque specMain Bearing Cap Bolts75 Nm (55 lb-ft)
- 17Final Main Bearing InstallationIf endplay adjustment was needed, remove caps, replace thrust bearings, and repeat clearance check. Once all measurements are within specification, perform final installation. Apply fresh assembly lube to all bearing surfaces. Install crankshaft, install caps in correct order with new bolts. Torque main cap bolts to the Cummins-specified initial value in sequence from center (#4) outward to ends, then apply the specified torque angle in same sequence (verify torque and angle against Cummins service manual). Verify crankshaft rotates freely by hand.Torque specMain Bearing Cap Bolts75 Nm (55 lb-ft)
- 18Install Rear Main SealInstall new rear main seal in housing using seal driver or appropriate socket. Seal lip should face engine interior. Apply small amount of RTV sealant to outer edge of seal housing where it meets block. Torque seal housing bolts evenly.
- 19Reinstall Timing ComponentsInstall oil pump drive gear ensuring proper timing marks alignment. Install new timing cover gasket with RTV sealant at block-to-oil pan junctions. Install timing cover and torque cover bolts to specification. Install harmonic balancer ensuring keyway alignment. Torque balancer bolt to specification.
- 20Reinstall Oil Pickup and PanInstall new O-ring on oil pump pickup tube. Install pickup tube and torque mounting bolts to specification. Clean oil pan thoroughly and install new gasket. Apply thin bead of RTV at block corners where timing cover and rear seal housing meet. Install oil pan and torque bolts in sequence from center outward.Torque specOil Pump Pickup Tube12 Nm (9 lb-ft)Oil Pan Bolt12 Nm (9 lb-ft)
- 21Install FlywheelClean flywheel mounting surface and crankshaft flange. Align flywheel with marks made during disassembly. Install new flywheel bolts (if TTY type) and torque in star pattern to specification. Apply thread locker if specified by manufacturer.Torque specFlywheel Bolts95 Nm (70 lb-ft)
- 22Reinstall EngineRemove engine from stand and attach to hoist. Carefully lower engine into vehicle, aligning engine mounts and transmission input shaft. Install transmission-to-engine bolts and torque to specification. Install engine mount bolts. Reconnect all previously disconnected components in reverse order of removal including exhaust, cooling system, fuel lines, wiring, and accessories.Torque specTransmission-to-Engine Bolts55 Nm (41 lb-ft)Sensor Mounting Bolts11 Nm (8 lb-ft)
- 23Fill Fluids and Prime Oil SystemInstall new oil filter. Fill engine with 12 quarts of 15W-40 diesel engine oil. Fill cooling system with 28 quarts of appropriate coolant mixture. Before starting engine, prime oil system by cranking engine with fueling disabled (disconnect fuel shut-off solenoid on 1994-1998 engines, or use the appropriate fuel-disable method for VP44/common-rail engines) until oil pressure registers on gauge. Reconnect fuel solenoid.
Reassembly
- Torque specifications are critical - use calibrated torque wrench and angle gauge
- Main bearing cap bolts are torque-to-yield and must be replaced with new bolts
- Follow torque sequences carefully, especially for main caps (center outward)
- Verify crankshaft rotates freely by hand before reinstalling oil pan
- Double-check all clearances before final assembly - corrections after installation require complete disassembly
- Use only specified assembly lube on bearings - do not use engine oil or grease
Verification
- Verify oil pressure reaches normal operating pressure (10 psi per 1000 RPM minimum) within 15 seconds of startup
- Listen for abnormal engine noises during initial startup - any knocking indicates bearing problem
- Monitor oil pressure gauge during initial 20-minute break-in period at varying RPM
- Check for oil leaks at pan gasket, timing cover, and rear main seal
- Verify no coolant leaks at all connection points
- Check that all electrical connectors and sensors are properly connected and functioning
- After initial startup and warm-up, shut down and recheck oil level - add as needed
- Perform test drive and monitor oil pressure under load
- After 500 miles, change engine oil and filter and inspect for metal particles indicating bearing wear