hvac
AC Hose - High Side
for 2017 Maserati Levante 3.0L V6 Twin Turbo · AWD
Difficulty
Advanced
Time
2.2 h
Tools
10
Steps
13
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
This procedure covers the removal and replacement of the high-side AC hose on a 2017 Maserati Levante with 3.0L V6 Twin Turbo engine, including refrigerant recovery, hose replacement, and system recharge.
Warnings
⚠️AC refrigerant can cause severe frostbite and blindness. Only EPA-certified technicians should handle refrigerant recovery and recharge.
⚠️Never disconnect AC lines with refrigerant still in the system. System must be fully recovered first.
⚠Engine and AC components may be extremely hot. Allow vehicle to cool completely before starting work.
⚠Contamination of the AC system can cause compressor failure. Maintain absolute cleanliness during all procedures.
ℹ️This vehicle uses R-134a refrigerant. System capacity is approximately 650-750 grams depending on configuration.
Tools required
Torque wrench (5-50 Nm range)Essential
Line wrench set (flare nut wrenches)Essential
AC vacuum pumpEssential
AC manifold gauge setEssential
Socket set (metric)Essential
Refrigerant scaleEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- AC high-side hose assembly × 1 — Use OEM specification
- AC line O-rings (various sizes) × 1 — Use OEM specification
- R-134a refrigerant × 1 — Per system capacity specification
- PAG oil (compatible with system) × 1 — Use OEM specification
- UV dye (if not pre-installed) × 1 — Use OEM specification
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Preparation
- Verify AC system complaint and document current operation before beginning work
- Ensure vehicle is parked on level surface in well-ventilated area
- Allow engine and AC system to cool completely (minimum 2 hours)
- Disconnect negative battery terminal and wait 10 minutes for system capacitor discharge
- Remove engine cover by pulling upward on four retention points
- Document refrigerant amount recovered for proper recharge quantity
Procedure
- 1Recover AC refrigerantConnect AC recovery machine to service ports (low side on accumulator, high side near condenser). Follow machine instructions to fully recover all refrigerant from system. Record the amount recovered. Allow system to stabilize at 0 PSI for at least 5 minutes to verify no residual pressure remains.
- 2Access high-side hose at compressorThe high-side hose connects to the compressor on the passenger side of the engine bay. Remove any plastic covers or shields blocking access to the compressor area. On the Levante, you may need to remove the forward undershield for better access to lower connections.Torque specCover Screws11 Nm (8 lb-ft)
- 3Disconnect high-side hose at compressorUsing a line wrench to prevent rounding, carefully loosen the high-side hose fitting at the compressor discharge port. Once loose, unthread by hand and remove the hose. Immediately cap both the compressor port and hose end to prevent contamination. Remove and discard the O-rings from the fitting.⚠If any refrigerant escapes during disconnection, STOP immediately. System was not fully recovered and could cause injury.
- 4Trace and disconnect condenser connectionFollow the high-side hose from the compressor toward the condenser at the front of the vehicle. The hose typically routes along the passenger side frame rail. Locate the connection point at the condenser (usually near the top). Use a line wrench to disconnect the fitting at the condenser. Cap both openings immediately and remove O-rings.
- 5Remove hose from vehicleThe high-side hose is secured with clips and brackets along its routing path. Working from compressor to condenser, release all mounting clips and brackets. Note the exact routing and clip positions for reinstallation. Carefully extract the hose from the engine bay, avoiding contact with sharp edges or hot components.
- 6Inspect system componentsWith hose removed, inspect both the compressor discharge port and condenser inlet for debris, metal particles, or oil residue. Clean ports with lint-free cloth if needed. Check compressor clutch for free rotation and bearing noise. Inspect condenser for external damage or leaks. Any contamination indicates possible compressor failure requiring additional service.⚠Metal particles or black residue indicate compressor failure. System must be flushed and compressor replaced before installing new hose.
- 7Prepare new high-side hoseRemove caps from new hose immediately before installation. Install new O-rings on both hose fittings (supplied with hose or purchased separately). Lightly coat O-rings with fresh PAG oil compatible with the system (typically PAG 46 for Levante). Add approximately 10-15ml of PAG oil into the hose itself to replace oil lost with old hose.
- 8Route and position new hoseRoute the new high-side hose along the same path as the original, ensuring it follows factory routing exactly. Position hose so fittings align with compressor and condenser ports without tension or kinking. Secure hose with original clips and brackets, but do not fully tighten mounting hardware yet.
- 9Connect hose at compressorRemove cap from compressor discharge port. Thread the high-side hose fitting onto compressor by hand, ensuring O-ring seats properly and threads engage smoothly. Once hand-tight, use torque wrench and line wrench to tighten to specification. Do not overtighten as this can damage O-rings and cause leaks.Torque specAC Line Fittings20 Nm (15 lb-ft)
- 10Connect hose at condenserRemove cap from condenser inlet port. Thread the high-side hose fitting onto condenser by hand, verifying smooth thread engagement and proper O-ring seating. Torque to specification using torque wrench and line wrench to prevent fitting damage.Torque specAC Line Fittings20 Nm (15 lb-ft)
- 11Secure hose routing and hardwareWith both connections torqued, verify hose routing has no kinks, sharp bends, or contact with moving parts or hot surfaces. Tighten all mounting clips and bracket hardware to secure the hose in proper position. Ensure minimum 1 inch clearance from exhaust manifolds and turbochargers.Torque specMounting Bracket Bolts26 Nm (19 lb-ft)
- 12Evacuate AC systemConnect vacuum pump to AC service ports. Evacuate system to full vacuum (29.9 inches Hg or -101 kPa) and maintain for minimum 45 minutes. Close valves and observe vacuum for 10 minutes. Vacuum should hold steady, indicating no leaks. If vacuum drops more than 1 inch Hg, locate and repair leak before proceeding.ℹ️Proper evacuation is critical to remove all moisture from the system. Moisture causes corrosion and compressor damage.
- 13Recharge AC systemWith system under vacuum, connect refrigerant supply (use recorded recovery amount or factory specification, typically 650-750 grams for Levante). Charge system through low-side port only, with engine running and AC on maximum cold. Monitor pressure and temperature. Add UV dye if not already present in system. Final pressures should be approximately 30-45 PSI low side and 200-250 PSI high side at idle with ambient temperature around 75°F.
Reassembly
- Reinstall any shields or covers removed for access, torquing fasteners to specification
- Reinstall engine cover by aligning and pressing down on retention points until clicks are heard
- Reconnect negative battery terminal and verify no warning lights appear
- Clear any AC-related fault codes from vehicle computer using scan tool
Verification
- Start engine and set AC to maximum cold with high blower speed
- Verify compressor clutch engages and remains engaged consistently
- Check vent temperature reaches 38-42°F within 5 minutes of operation
- Inspect all AC line connections for oil seepage or frost indicating leaks
- Use leak detector around all connections, especially new high-side hose fittings
- Monitor system pressures: low side should be 30-45 PSI, high side 200-250 PSI at idle with 75°F ambient
- Verify no unusual noises from compressor or abnormal cycling
- Test drive vehicle and confirm AC operates properly under all conditions