engine
Cylinder Head R&R
for 2017 Dodge Viper 8.4L V10 · RWD
Difficulty
Expert
Time
8.9 h
Tools
13
Steps
15
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
Complete removal and reinstallation of cylinder heads on the 2008 Dodge Viper 8.4L V10 engine, including disassembly of intake/exhaust manifolds, valve train components, and all associated systems.
Warnings
⚠️Allow engine to cool completely before beginning work. Coolant system operates under pressure and can cause severe burns.
⚠️Engine must be supported with proper hoist or fixture throughout procedure. Do not rely on motor mounts alone.
⚠Cylinder head bolts may be torque-to-yield (TTY) design. Verify replacement requirements before removal.
⚠Mark all electrical connectors and vacuum lines for proper reassembly. The V10 has complex routing that is not intuitive.
⚠Do not allow dirt or debris to enter exposed cylinders or oil passages. Cover openings immediately after component removal.
ℹ️Cylinder heads are aluminum and extremely heavy. Use proper lifting technique and assistance.
Tools required
Socket set (metric)Essential
Torque angle gaugeEssential
Engine hoist or support fixtureEssential
Cylinder head alignment dowelsEssential
Gasket scraper (plastic)Essential
Breaker barEssential
Drain pans (large capacity)Essential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Cylinder head gasket set (left and right) × 1 — Use OEM Mopar specification
- Intake manifold gaskets × 1 — Use OEM Mopar specification
- Exhaust manifold gaskets × 2 — Use OEM Mopar specification
- Valve cover gaskets × 2 — Use OEM Mopar specification
- Coolant temperature sensor O-ring × 2 — Use OEM specification
- Thermostat housing gasket × 1 — Use OEM specification
- Engine coolant × 1 — Mopar HOAT 50/50
- Engine oil and filter × 1 — 0W-40 full synthetic
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Fluids
- coolant — 19 qt
- engine_oil — 11 qt
Preparation
- Park vehicle on level surface and engage parking brake
- Disconnect negative battery cable and wait 2 minutes for airbag system discharge
- Remove engine cover panels
- Drain cooling system completely by opening radiator petcock and removing lower radiator hose
- Drain engine oil and remove oil filter
- Relieve fuel system pressure by removing fuel pump relay and cranking engine until it fails to start
- Label and photograph all electrical connectors, vacuum lines, and hose routing for reference
- Install engine support fixture or attach engine hoist to lifting eyes
Procedure
- 1Remove intake system componentsRemove air intake tube and air filter housing assembly. Disconnect throttle body electrical connector and remove throttle body. Disconnect all vacuum lines from intake plenum, labeling each connection. Remove PCV hoses and breather tubes from valve covers. Disconnect all intake-mounted sensor connectors (such as MAP/MAF and IAT as equipped), verifying the specific sensor configuration against the factory service manual for the 2008 Dodge Viper 8.4L V10.
- 2Remove fuel system componentsDisconnect fuel supply and return lines at fuel rail using appropriate disconnect tools. Remove the fuel rail mounting bolts, verifying the exact bolt count against the factory service manual, and carefully lift fuel rail with injectors attached. Disconnect injector electrical connectors as an assembly. Cap all open fuel lines and ports immediately to prevent contamination.⚠Residual fuel pressure may remain. Have absorbent towels ready for minor fuel spillage.
- 3Remove intake manifoldDisconnect coolant bypass hoses from intake manifold. Remove intake manifold bolts in reverse of the tightening sequence (outer toward center), verifying the exact bolt count and sequence against the factory service manual for the 2008 Dodge Viper 8.4L V10. Carefully lift intake manifold assembly from engine, watching for any attached hoses or wiring. Remove intake manifold gaskets and inspect mating surfaces for damage.
- 4Remove ignition componentsDisconnect all 10 ignition coil electrical connectors. Remove ignition coil mounting bolts (1 bolt per coil) and extract coils from spark plug tubes. Using appropriate spark plug socket, remove all 10 spark plugs. Store plugs in order for inspection.
- 5Remove valve coversDisconnect any remaining breather hoses or electrical connectors on valve covers. Remove valve cover bolts, verifying the exact bolt count per cover against the factory service manual for the 2008 Dodge Viper 8.4L V10. Carefully lift valve covers off cylinder heads. If gaskets are stuck, gently pry at designated pry points only. Remove and discard valve cover gaskets.
- 6Remove exhaust manifoldsFrom underneath vehicle, disconnect exhaust pipes from exhaust manifolds at flange connections. Remove exhaust manifold heat shields if equipped. Remove exhaust manifold mounting bolts, verifying the exact bolt count per manifold against the factory service manual for the 2008 Dodge Viper 8.4L V10. Extract exhaust manifolds from cylinder heads. Remove and discard exhaust manifold gaskets.⚠Exhaust manifold studs may break during removal due to corrosion. Penetrating oil applied 24 hours prior is recommended.
- 7Remove rocker arm assembliesLoosen rocker arm shaft bolts evenly in multiple passes working from the ends toward the center to prevent shaft distortion. Remove rocker arm shaft assemblies complete with rockers and springs. Keep left and right bank assemblies separate and labeled. Do not disassemble rocker shafts unless individual component replacement is required.
- 8Remove pushrodsRemove all 20 pushrods from engine, keeping them in order. Use a numbered pushrod holder or mark each pushrod's location and orientation. Inspect pushrods for wear, scoring, or bending. Cover cylinder head bolt holes and valve openings with clean shop towels to prevent debris entry.
- 9Remove cylinder head boltsRemove cylinder head bolts in reverse of tightening sequence, working from outer bolts toward center in multiple passes. Verify the exact cylinder head bolt count and removal sequence against the 2008 Dodge Viper 8.4L V10 factory service manual before proceeding. Once loosened, remove bolts completely and store separately for inspection. Check bolts for stretching or necking - if TTY bolts, replacement is mandatory. Once loosened, remove bolts completely and store separately for inspection. Check bolts for stretching or necking - if TTY bolts, replacement is mandatory.⚠Follow proper sequence to prevent cylinder head warping. Loosen bolts gradually, no more than 1/4 turn per pass.
- 10Remove cylinder headsWith assistance, carefully break cylinder heads free from block using soft pry points at designated locations only (never pry on gasket mating surfaces). Lift cylinder heads straight up to avoid damage to dowel pins. Place cylinder heads on padded surface with combustion chambers facing up. Remove and discard cylinder head gaskets. Cover exposed cylinders immediately with clean shop towels.
- 11Clean and inspect mating surfacesUsing plastic gasket scraper, carefully remove all gasket material from cylinder head and block mating surfaces. Do not use metal scrapers on aluminum surfaces. Clean surfaces with degreaser and lint-free cloths. Inspect cylinder head mating surfaces for warping using precision straightedge and feeler gauges - compare measured warpage against the maximum allowable specification in the factory service manual for the 2008 Dodge Viper 8.4L V10. Inspect block deck for damage or corrosion. Check cylinder head dowel pins are intact and not damaged.
- 12Install new cylinder head gasketsVerify block mating surfaces are completely clean and dry. Install new cylinder head gaskets onto block, ensuring correct left/right orientation and proper alignment with dowel pins and coolant passages. Do not use any sealant unless specifically required by gasket manufacturer. Gaskets are marked for front/rear and left/right bank orientation.
- 13Install cylinder headsWith assistance, carefully lower cylinder heads onto block, aligning with dowel pins. Ensure gaskets remain properly positioned during installation. Install cylinder head alignment dowels if available to prevent gasket shifting. Hand-start all cylinder head bolts before tightening any. Follow the exact cylinder head bolt torque sequence, staging, and torque/angle values specified in the factory service manual for the 2008 Dodge Viper 8.4L V10. Do not use generic torque values or sequences. If TTY bolts are used, they must be new.⚠Cylinder head bolt torque sequence and specifications are critical. Incorrect torque will result in gasket failure and potential engine damage.
- 14Install pushrods and rocker assembliesInstall pushrods in their original positions, ensuring each pushrod seats properly in its lifter. Coat rocker arm shaft bolts and contact surfaces with engine assembly lubricant. Install rocker arm shaft assemblies, ensuring proper orientation (oil passages face down). Tighten rocker shaft bolts evenly in multiple passes working from center outward to specified torque.
- 15Complete reassemblyInstall new exhaust manifold gaskets and mount exhaust manifolds, torquing bolts to specification in sequence from center outward. Install new valve cover gaskets and valve covers, torquing bolts evenly to specification. Install spark plugs to specification. Install ignition coils with new O-rings if equipped. Install intake manifold with new gaskets, torquing bolts in proper sequence from center outward. Reconnect fuel rail and injectors. Reconnect all vacuum lines, electrical connectors, coolant hoses, and breather tubes per documentation from disassembly. Install throttle body with new gasket. Install air intake system.
Reassembly
- Fill cooling system with Mopar HOAT 50/50 coolant to proper level (19 quarts total capacity)
- Fill engine with 0W-40 full synthetic oil (11 quarts) and install new oil filter
- Reconnect negative battery cable
- Prime fuel system by cycling ignition on/off three times without starting
- Remove engine support fixture or hoist
- Double-check all electrical connectors, hoses, and hardware are properly secured
- Install engine cover panels
Verification
- Before starting engine, manually rotate crankshaft two complete revolutions to verify valve train operation and check for binding
- Start engine and verify it runs smoothly without unusual noises, paying attention to valve train operation
- Check for coolant, oil, fuel, and exhaust leaks at all service points
- Allow engine to reach operating temperature and verify cooling system operation
- Check coolant and oil levels after initial warm-up, top off as necessary
- Monitor engine temperature gauge during test drive to ensure proper cooling system function
- Verify no check engine light or codes are present after test drive
- Re-check cylinder head bolt torque after initial heat cycle if using non-TTY bolts (verify procedure with manufacturer specifications)
Related trouble codes on this vehicle
Codes that commonly send this job to the bay — tap one for symptoms, causes, and diagnostic steps.
P0201Injector Circuit/Open - Cylinder 1P0202Injector Circuit/Open - Cylinder 2P0210Injector Circuit/Open - Cylinder 10P0211Injector Circuit/Open - Cylinder 11P0261Cylinder 1 Injector Circuit LowP0262Cylinder 1 Injector Circuit HighP0270Cylinder 4 Injection Circuit LowP0271Cylinder 4 Injection Circuit HighP0280Cylinder 6 Injector Circuit LowP0281Cylinder 6 Injector Circuit High
Chasing one of these codes and not sure which part is guilty? Ask a master mechanic about YOUR car →