Free API
8.4L V10•RWD•MANUAL•gas
Founding sponsor spot is openYour name on every procedure for this vehicle, permanently.Sponsor — $99 →
engine

Valve Job - Complete

for 2017 Dodge Viper 8.4L V10 · RWD
Difficulty
Expert
Time
19.2 h
Tools
25
Steps
19
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.

Complete valve job for the 2008 Dodge Viper 8.4L V10, including cylinder head removal, valve reconditioning, valve guide and seat service, and head reinstallation with timing component service.

Warnings

⚠️Engine must be completely cool before disassembly. Hot coolant and components can cause severe burns.
⚠️Relieve fuel system pressure before disconnecting fuel lines. Fuel under pressure can spray and ignite.
⚠The 8.4L V10 cylinder heads are aluminum and easily damaged. Do not over-torque fasteners or use excessive force during disassembly.
⚠Mark all camshaft bearing caps and positions before removal. Incorrect installation will cause catastrophic engine damage.
⚠Do not rotate crankshaft or camshafts independently once timing components are disturbed unless properly locked with special tools.
ℹ️This procedure requires machine shop services for valve seat cutting, guide replacement, and head resurfacing. Plan accordingly.
ℹ️Keep all hardware organized by cylinder bank and component. Label and bag fasteners as removed.

Tools required

Oil drain panEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.

Parts

As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.

Fluids

  • Mopar HOAT coolant 50/50 — 19 qt
  • 0W-40 full synthetic — 11 qt

Preparation

  1. Park vehicle on level surface and ensure adequate workspace around engine bay.
  2. Disconnect negative battery cable and secure away from terminal.
  3. Allow engine to cool completely for minimum 3 hours.
  4. Drain engine coolant completely into suitable container by opening radiator drain and block drains.
  5. Drain engine oil and remove oil filter.
  6. Relieve fuel system pressure by removing fuel pump relay and cranking engine until it fails to start.
  7. Remove engine cover and any decorative plastic covers.
  8. Label and photograph all vacuum lines, electrical connectors, and hose routing for reassembly reference.
  9. Prepare clean workspace and cylinder head stands for heads once removed.
  10. Obtain cylinder head resurfacing and valve service from qualified machine shop or prepare in-house equipment.

Procedure

  1. 1
    Remove intake system and fuel components
    Disconnect air intake tube from throttle body. Remove complete intake manifold assembly by disconnecting all fuel injector connectors, ignition coil connectors, and throttle body connections. Disconnect fuel supply and return lines using proper fuel line disconnect tools. Remove fuel rail assemblies with injectors as a complete unit. Remove intake manifold mounting bolts working from center outward and lift manifold clear. Inspect and discard intake manifold gaskets.
  2. 2
    Remove valve covers and accessory components
    Disconnect ignition coil connectors from all 10 cylinders, noting cylinder position. Note that this engine uses individual coil-on-plug (COP) ignition, not spark plug wires. Remove ignition coils and spark plugs, keeping them organized by cylinder. Remove valve covers from both cylinder banks by removing mounting bolts. Note that valve cover bolt count is typically 10-12 per cover. Disconnect any breather hoses and PCV system components. Remove accessory drive belt and tensioner. Remove alternator and A/C compressor (set aside without disconnecting refrigerant lines). Remove power steering pump and set aside with lines attached.
  3. 3
    Remove exhaust manifolds
    Disconnect oxygen sensor connectors on both banks. Working from underneath if necessary, remove exhaust manifold mounting bolts from both cylinder banks. Verify the exact exhaust manifold bolt count per manifold against OEM service information for the 8.4L V10 before removal. Support exhaust system as needed and separate manifolds from cylinder heads. Remove and discard exhaust manifold gaskets. Inspect manifold studs for damage and replace if threads are compromised.
  4. 4
    Remove timing chain cover and set timing position
    Remove harmonic balancer using appropriate puller tool. Remove timing chain cover bolts and carefully pry cover away from block, noting location of any alignment dowels. Rotate crankshaft to bring cylinder 1 to TDC on compression stroke, verified by timing marks on the camshaft and crankshaft sprockets aligning. Lock crankshaft position using OEM locking tool or fabricate a holding method. Photograph and note the single timing chain and sprocket alignment before disturbing. Photograph timing chain and sprocket alignment before disturbing.
  5. 5
    Remove camshaft timing components
    This engine is a pushrod OHV design with a single in-block camshaft. Remove rocker arms, pushrods, and hydraulic lifters, keeping all components organized by cylinder position for reinstallation in original locations. The camshaft is located in the engine block valley and is not removed as part of a standard valve job unless cam replacement is required.der heads, noting any thrust bearing locations. Remove timing chain, cam sprockets, and chain tensioners. Inspect all timing components for wear and replace as needed during reassembly.
  6. 6
    Remove cylinder heads
    Remove cylinder head bolts in reverse of tightening sequence, working from outside bolts toward center bolts in three progressive passes. Verify the exact head bolt count per cylinder head against OEM service information for the 8.4L V10 before removal; do not assume a fixed number. Once all head bolts are removed, carefully break gasket seal using plastic mallet taps on designated pry points. Do NOT pry between head and block mating surfaces. Lift cylinder heads straight up using appropriate lifting method or with assistant help. Place heads immediately on cylinder head stands with combustion chambers facing up. Remove and discard cylinder head gaskets. Inspect block deck surface for damage or warpage.
  7. 7
    Disassemble cylinder heads and remove valves
    With cylinder heads on stands, compress valve springs using overhead cam valve spring compressor tool. Remove valve spring keepers (locks) carefully to prevent loss. Release spring compressor and remove valve spring retainers and valve springs. Keep springs organized by cylinder and position. Remove valve stem seals using appropriate removal tool or pliers. Slide valves out from combustion chamber side of head. Keep all valves in order by cylinder number and intake/exhaust position using labeled rack or egg carton method. Each head contains 10 valves (1 intake, 1 exhaust per cylinder, 5 cylinders per bank; 20 valves total for the engine).
  8. 8
    Clean and inspect valves and seats
    Thoroughly clean all valves using solvent and wire brush, removing all carbon deposits from valve faces and stems. Clean valve guides using appropriate sized brush and solvent. Clean combustion chambers and valve seats with appropriate cleaning tools, being careful not to damage aluminum. Inspect each valve face for burning, pitting, or excessive wear. Measure valve stem diameter with micrometer at multiple points to check for wear or taper. Measure valve stem-to-guide clearance using telescoping gauges in guide bores and comparing to valve stem diameter. Inspect valve seats for pitting, recession, or cracking. Measure valve spring free length and compare to specification to determine if replacement is needed.
  9. 9
    Machine shop services - valve guides
    If valve guide wear exceeds specification (typically 0.004 inch clearance maximum), guides must be replaced. Using valve guide removal driver and press or hammer method, drive old guides out from combustion chamber side. Measure guide bore diameter in cylinder head. Install new guides by driving from camshaft side until they seat at proper installed height per OEM specification. Ream new guides to final dimension to achieve proper valve stem clearance of 0.001-0.003 inch for intake and 0.002-0.004 inch for exhaust. Verify clearance with telescoping gauge and micrometer.
  10. 10
    Machine shop services - valve seat reconditioning
    Using valve seat cutting equipment or grinding stones, recondition all valve seats to proper angles. Standard seat angle is 45 degrees with top and bottom angle cuts to achieve proper seat width. Target seat width is 0.040-0.060 inch for intake valves and 0.050-0.070 inch for exhaust valves. Use valve seat runout gauge and dial indicator to verify seat concentricity is within 0.002 inch total indicator reading. If seats are too badly damaged or recessed, seat inserts may require replacement, which involves machining oversized counterbore and installing hardened seat inserts.
  11. 11
    Machine shop services - valve reconditioning and lapping
    Using valve refacing machine, reface all valves to restore proper sealing surface and angle. Maintain original valve face angle or match to seat angle. Remove minimum material necessary. Ensure valve margin thickness remains above 0.030 inch minimum after refacing. Apply valve grinding compound to valve face and corresponding seat. Using valve lapping tool or hand method with suction cup, lap each valve to its seat using rotating motion until uniform grey contact pattern appears around entire circumference of both valve face and seat. Clean all grinding compound thoroughly with solvent. Verify valve-to-seat contact pattern is centered on valve face and seat width is within specification. Note: Spark plugs
  12. 12
    Machine shop services - cylinder head resurfacing
    Using precision milling machine or surface grinder, resurface cylinder head deck to restore flatness and remove any warpage. Check head flatness with precision straightedge and feeler gauges before machining. Maximum allowable warpage is typically 0.004 inch across length or width. Remove minimum material necessary to achieve flatness within 0.002 inch. After resurfacing, verify final head height/thickness is within OEM specification range to maintain proper compression ratio and valve-to-piston clearance. Clean head thoroughly after machining to remove all metal particles.
  13. 13
    Reassemble cylinder heads with new valve stem seals
    Install new valve stem seals on all valve guides using appropriate seal installation tool to prevent damage. Seals should bottom against guide top. Lubricate valve stems lightly with clean engine oil. Install valves into their original positions through guides from combustion chamber side. Install valve springs with closer-wound coils toward cylinder head (if applicable). Install valve spring retainers. Using valve spring compressor, compress springs and install valve spring keepers (locks) in valve stem grooves. Carefully release compressor and verify keepers are fully seated. Tap valve stem ends lightly with plastic hammer to ensure keepers are locked in place. Verify installed valve spring height and pressure meet specifications if spring tester is available. Note: With cylinder heads on stands, compress valve springs using a C-clamp or lever-type valve spring compressor suitable for pushrod cylinder heads.
  14. 14
    Install cylinder heads
    Clean block deck surfaces thoroughly with appropriate gasket scraper and solvent, ensuring no residue remains. Verify block deck flatness with straightedge. Clean cylinder head bolt holes in block using thread chaser or tap and blow out with compressed air. Check head bolt condition and measure length if torque-to-yield type; replace if stretched beyond specification. Install new cylinder head gaskets on block with proper orientation, noting any front/rear markings and coolant passage alignment. Carefully position cylinder heads on block, using guide dowels for alignment. Install head bolts with light oil on threads and under bolt heads. Tighten head bolts in three stages following proper sequence, starting from center and working outward in spiral pattern. Final torque values and angle specifications must be obtained from OEM service information as they are not provided in database.
  15. 15
    Install camshafts and timing components
    Reinstall hydraulic lifters, pushrods, and rocker arms in their original positions, lubricating all contact surfaces with engine assembly lube. Torque rocker arm/shaft fasteners to OEM specification. If the timing chain and single in-block camshaft were disturbed, verify timing mark alignment between crankshaft and camshaft sprockets per OEM specification before proceeding. Manually rotate engine two complete revolutions and recheck alignment to confirm correct installation. sequence, working from center outward. Torque bearing cap bolts to specification. Install cam sprockets on camshafts with timing marks properly positioned. Install timing chain over crankshaft and camshaft sprockets, ensuring all timing marks align per OEM specifications. Install chain tensioners and guides. Verify timing alignment before proceeding. Remove camshaft and crankshaft locking tools and manually rotate engine two complete revolutions, then recheck timing mark alignment to confirm correct installation. Note: Not applicable — this pushrod engine has no cylinder-head camshaft bearing caps. Obtain rocker arm/shaft torque specification from OEM service information.
  16. 16
    Install timing cover and front accessories
    Apply appropriate RTV sealant to timing cover mating surface per OEM specifications, noting any specific bead pattern requirements at oil pan junction. Install new timing cover gasket or seal as applicable. Install timing cover and tighten bolts to specification in proper sequence. Install harmonic balancer using installation tool (not hammer) and tighten center bolt to specification. Install water pump with new gasket. Install power steering pump, A/C compressor, and alternator. Install accessory drive belt tensioner and belt, routing belt correctly per diagram on engine.
  17. 17
    Install exhaust manifolds and valve covers
    Install new exhaust manifold gaskets on cylinder heads. Position exhaust manifolds and install mounting bolts, tightening from center outward to specification. Reconnect oxygen sensors. Clean valve cover mating surfaces on cylinder heads thoroughly. Install new valve cover gaskets, ensuring proper seating in cover grooves. Install valve covers and tighten bolts evenly in criss-cross pattern to specification to prevent gasket distortion. Reconnect PCV and breather hoses. Install spark plugs and tighten to OEM torque specification (do not use anti-seize on pre-coated plugs unless OEM specifies). Install ignition coils directly onto plugs and reconnect coil connectors. This engine uses coil-on-plug ignition with no separate spark plug wires.
  18. 18
    Install intake manifold and fuel system
    Install new intake manifold gaskets on cylinder heads with proper orientation. Position intake manifold and install mounting bolts, tightening from center outward in proper sequence to specification. Install fuel rail assemblies with injectors, using new O-rings lubricated with clean engine oil. Tighten fuel rail mounting bolts. Reconnect all fuel injector electrical connectors. Reconnect throttle body connections and any vacuum lines per earlier photos and notes. Connect fuel supply and return lines. Install air intake system to throttle body.
  19. 19
    Refill fluids and initial startup
    Install new oil filter and refill crankcase with the OEM-specified capacity (approximately 8 quarts) of 0W-40 full synthetic engine oil; verify exact capacity per OEM documentation. Close all coolant drains and refill cooling system with Mopar HOAT 50/50 coolant to the OEM-specified system capacity; verify exact capacity per OEM documentation. Reconnect negative battery cable. Turn ignition key to ON position without starting to pressurize fuel system; check for fuel leaks. Correct any leaks before starting. Disable ignition system and crank engine for 10-15 seconds to build oil pressure. Enable ignition and start engine. Monitor for oil pressure indication immediately. Check for any coolant, oil, or fuel leaks. Allow engine to reach operating temperature while monitoring for leaks and abnormal noises. Bleed cooling system per OEM procedure to remove air pockets.

Reassembly

  1. Torque all fasteners to OEM specifications using proper sequence where applicable
  2. Replace all gaskets and seals; do not reuse old gaskets
  3. Verify timing alignment after any work on timing components
  4. Ensure all electrical connectors are fully seated and locked
  5. Double-check that all tools and rags are removed from engine bay before starting
  6. Use new head bolts if OEM specifies torque-to-yield type
  7. Follow proper valve lash adjustment procedure if applicable to this engine (verify if solid or hydraulic lash adjusters are used)

Verification

  • Engine starts readily and idles smoothly without excessive noise or vibration
  • Oil pressure reaches normal operating range within 5 seconds of startup
  • No coolant, oil, or fuel leaks present after reaching operating temperature
  • Engine reaches normal operating temperature and cooling fan cycles properly
  • No check engine light or diagnostic trouble codes present
  • Exhaust is clean without excessive smoke (slight white smoke during initial startup is normal from assembly lubricants)
  • Engine responds properly to throttle input without hesitation or misfires
  • Perform compression test or leak-down test to verify valve sealing if equipment available
  • Road test vehicle under various load conditions to verify proper operation
  • Recheck all fluid levels after test drive and top off as needed
  • Recheck valve cover, intake manifold, and exhaust manifold areas for any seepage after 100 miles of operation

Related trouble codes on this vehicle

Codes that commonly send this job to the bay — tap one for symptoms, causes, and diagnostic steps.

Chasing one of these codes and not sure which part is guilty? Ask a master mechanic about YOUR car →

🔧Stuck on this valve job - complete? Take it to The Diag Desk.A human with 20+ years in the bay answers about YOUR Dodge within 24 hours — never AI. $25, and you're not charged unless you get an answer.Ask a tech →

More procedures for this vehicle

🔧 Built by master technician Chris Hackleman · Master Technician · 20+ years. Spot an error? Use the Help link above — a human reads every report.
Stuck on this repair? Take it to The Diag Desk — ask a master tech about this exact car → real human answer within 24h, never AI
⚠ STILL BEHIND THE PAYWALL
The 2017 Dodge Viper repair data is incomplete because no one has sponsored it yet. For $99, we generate the full step-by-step procedures, then fact-check them with a second AI pass and your expert review. Your name on every procedure, permanently.
The same data would cost $169/mo from Mitchell1 or $30/year from ALLDATAdiy — and you'd be renting access, not freeing it. Sponsor once, free forever.
Sponsor the Dodge Viper — $99 →
Building an app?
Free API access to all this data — 10 requests/day, no card required.
Get an API key →
Run a shop?
Manage repairs, estimates, and customers with Auto Shop Base — $249/mo, all features included.
Try Auto Shop Base →