engine
Head Gaskets - Both
for 2007 Ram 3500 5.9L I6 Cummins · 4WD
Difficulty
Expert
Time
15.7 h
Tools
16
Steps
15
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
Complete cylinder head gasket replacement for the 5.9L Cummins diesel inline-6 engine, including removal and reinstallation of the single cylinder head.
Warnings
⚠️Disconnect both battery cables and wait 10 minutes before beginning work to avoid electrical shock and inadvertent starter engagement
⚠️The cylinder head weighs approximately 200 lbs - use proper lifting equipment and assistance to prevent serious injury
⚠The 5.9L Cummins uses torque-to-yield head bolts that MUST be replaced - reusing old bolts can result in head gasket failure
⚠Coolant system operates under pressure - ensure engine is completely cool before opening any coolant connections
⚠Fuel system operates at extremely high pressure (up to 23,000 psi on common rail systems) - relieve pressure before disconnecting any fuel lines
ℹ️This procedure requires the cylinder head to be checked for warpage and cracks - machine shop services may be necessary
ℹ️Mark all components during disassembly to ensure correct reassembly orientation
Tools required
Torque wrench (0-250 ft-lb)Essential
Torque angle gaugeEssential
Overhead valve spring compressorEssential
Dial indicator with magnetic baseEssential
Straight edge (minimum 12 inches)Essential
Feeler gauge setEssential
Socket set (metric and standard)Essential
Coolant drain pan (large capacity)Essential
Oil drain panEssential
Engine hoist or support fixtureEssential
Breaker bar (1/2 inch drive)Essential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Cylinder head gasket × 1 — Use OEM Cummins specification
- Valve cover gasket × 1 — Use OEM specification
- Exhaust manifold gasket × 1 — Use OEM specification
- Intake manifold gasket set × 1 — Use OEM specification
- Thermostat housing gasket × 1 — Use OEM specification
- Injector O-ring set × 1 — Use OEM Cummins specification
- Injector copper crush washers × 6 — Use OEM specification
- Cylinder head bolts (complete set) × 1 — Use OEM Cummins torque-to-yield bolts
- Rocker lever assembly bolts × 1 — Use OEM specification if reusing
- Engine oil × 1 — 15W-40 diesel or 5W-40 synthetic
- Coolant filter (if equipped) × 1 — Use OEM specification
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Fluids
- 15W-40 diesel oil or 5W-40 synthetic — 12 qt
- HOAT coolant 50/50 — 28 qt
Preparation
- Park vehicle on level surface and engage parking brake
- Disconnect both negative and positive battery cables
- Drain engine coolant completely from radiator petcock and block drains
- Drain engine oil and remove oil filter
- Remove engine cover and air intake system from turbocharger to air filter housing
- Remove intercooler tubes and charge air cooler connections
- Label and photograph all electrical connections, vacuum lines, and fuel lines for reassembly reference
- Support engine with hoist or fixture from overhead lifting eyes on engine block
- Relieve fuel system pressure by loosening fuel filter drain valve
Procedure
- 1Remove valve cover and accessory componentsRemove the valve cover by unbolting all perimeter bolts. Remove the fan shroud, viscous fan clutch assembly, and water pump pulley if necessary for access. Disconnect the power steering pump and bracket (support aside without disconnecting hoses). Remove alternator and mounting brackets as needed for cylinder head clearance.
- 2Disconnect fuel system componentsFor 24-valve common rail engines: disconnect high-pressure fuel rail from injectors and remove fuel rail assembly. Cap all openings immediately. For 12-valve P-pump engines: disconnect fuel lines from injection pump to injectors. Label each injector position. Disconnect fuel return lines and overflow valve connections. Use caps or plugs to prevent contamination entry.
- 3Remove intake and exhaust manifoldsUnbolt and remove the exhaust manifold, noting all retaining bolts per the service manual as the count varies with the multi-piece manifold design. On turbocharged models, disconnect turbocharger from exhaust manifold or remove as assembly. Remove intake manifold and intake horn assembly. Disconnect all remaining coolant hoses from thermostat housing and coolant crossover tube. Remove EGR components if equipped.
- 4Remove rocker lever assemblyUsing a systematic pattern from outside bolts toward center, loosen all rocker lever pedestal bolts gradually (multiple passes) to prevent binding. Remove rocker shaft assembly as a complete unit. Keep pushrods in order by position - use a numbered holder or mark each one. Inspect pushrod ends and rocker components for wear.
- 5Remove cylinder head boltsRemove cylinder head bolts in reverse order of tightening sequence (work from center outward in a crossing pattern). Since these are torque-to-yield bolts, they must be replaced and cannot be reused. If bolts are difficult to remove, apply penetrating oil and allow to soak. Check each bolt hole for coolant or oil indicating a potential breach.
- 6Remove cylinder headWith all bolts removed, carefully break the head seal using plastic pry points (avoid metal prying on sealing surfaces). Attach engine hoist to cylinder head lifting eyes. Lift head straight up to avoid damaging pistons or block surface. Place head on padded surface with valves facing up. Remove and keep track of dowel pins from block.
- 7Clean and inspect cylinder head and block surfacesThoroughly clean all gasket material from cylinder head and block deck surfaces using appropriate scrapers - avoid gouging the cast-iron sealing surfaces or using aggressive abrasive pads that could distort the deck. Clean bolt holes in block with brake cleaner and compressed air - any debris or oil will affect torque readings. Use straight edge and feeler gauges to check head and block for warpage - maximum allowable warpage is typically 0.002 inches per 6 inches. Check for cracks especially between valve seats and injector bores.
- 8Inspect and service cylinder head componentsWith head removed, inspect valve seats, valve guides, and valve faces. Check valve spring heights and pressures. Inspect injector bores for damage or carbon buildup. If head requires machining, take to qualified machine shop. Ensure the machine shop measures cylinder head thickness against the Cummins minimum thickness specification and does not resurface beyond the factory-allowed limit. Replace all valve stem seals if head is disassembled. Lap valves if necessary.
- 9Prepare for cylinder head installationVerify block surface is completely clean and dry. Install new dowel pins if originals are damaged. Chase all head bolt threads in block with proper thread chaser to ensure accurate torque readings. Wipe bolt holes with clean shop towel. Do not use any sealers on head gasket - install dry. Position new head gasket on block with 'TOP' or 'UP' marking visible and oriented correctly for engine. Verify gasket alignment with dowel pins and all oil and coolant passages.
- 10Install cylinder headUsing engine hoist, carefully lower cylinder head onto block, aligning with dowel pins. Guide head into position without sliding it across gasket surface. Hand-thread all new cylinder head bolts to ensure they all start without cross-threading. Install bolts with light oil on threads and under bolt heads as specified in service manual.
- 11Torque cylinder head boltsWithout torque specifications in the database, follow the Cummins factory service manual torque sequence precisely. Follow the exact Cummins factory service manual head bolt torque-plus-angle sequence for the 2007 5.9L ISB common rail engine - do not rely on any generic step values; confirm each torque and angle stage directly from the manual. Always work from center outward in crossing pattern. Verify torque wrench calibration before beginning. Do not skip any steps or deviate from sequence.
- 12Install pushrods and rocker assemblyInstall pushrods in their original positions, ensuring each seats properly in lifter socket. Apply assembly lube to rocker arm contact points and valve stem tips. Position rocker lever assembly onto pedestals. Install and hand-tighten all rocker shaft bolts. Torque rocker pedestal bolts to specification in sequence from center outward. Rotate engine by hand and verify all valves operate smoothly without binding.
- 13Adjust valve lashPerform valve lash adjustment per Cummins specification using the appropriate method for your engine (12-valve or 24-valve). For 24-valve engines, verify the exact cold valve lash specification in the Cummins service manual (approximately 0.010 inches intake and 0.026 inches exhaust) before adjusting. Adjust valves with engine cold in firing order sequence, positioning each cylinder at TDC compression stroke. Use proper feeler gauges and lock adjustment screws securely after setting.
- 14Install injectors and fuel system componentsInstall new injector O-rings and copper crush washers on each injector. Lubricate O-rings with clean diesel fuel. Install injectors into cylinder head, ensuring proper seating. For common rail systems, install fuel rail and torque hold-down hardware to specification. For P-pump systems, reconnect fuel lines ensuring proper routing. Connect fuel return lines and overflow valve. Double-check all connections are tight and properly secured.
- 15Reinstall manifolds and remaining componentsInstall new intake manifold gaskets and reinstall intake manifold and horn assembly. Install new exhaust manifold gasket and reinstall exhaust manifold (torque in sequence from center outward). Reconnect turbocharger if previously separated. Reinstall all coolant hoses and thermostat housing with new gasket. Install valve cover with new gasket. Reinstall alternator, power steering pump, and all brackets. Reinstall serpentine belt system, fan assembly, and shroud. Reconnect all electrical connections and sensors per documentation from disassembly.
Reassembly
- Verify all fasteners are properly torqued and no connections were missed
- Refill cooling system with proper 50/50 HOAT coolant mixture - use coolant fill and bleed procedure to eliminate air pockets
- Install new oil filter and refill engine with 12 quarts of appropriate diesel engine oil
- Reconnect both battery cables (positive first, then negative)
- Prime fuel system using lift pump or manual primer until firm resistance is felt
- For common rail systems, cycle ignition key several times without starting to allow fuel system to pressurize
Verification
- Perform initial start and allow engine to idle - monitor for unusual noises, vibrations, or leaks
- Check for fuel leaks at all injector connections and fuel rail while engine is running
- Monitor coolant level and temperature - watch for overheating or coolant loss
- Check for oil leaks at valve cover and any disturbed oil system components
- After engine reaches operating temperature, shut down and allow to cool, then recheck coolant level and add if necessary
- Perform a test drive monitoring engine temperature, oil pressure, and turbo boost levels
- After 500 miles, re-check valve lash adjustment and torque valve cover bolts
- Change oil and filter after first 500 miles to remove any assembly debris