engine
Intake Manifold Gasket
for 2007 Ram 3500 5.9L I6 Cummins · 4WD
Difficulty
Moderate
Time
3.5 h
Tools
10
Steps
15
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
This procedure replaces the intake manifold gasket on the 5.9L Cummins diesel engine, addressing air leaks that can cause rough idle, reduced power, and increased emissions.
Warnings
⚠Allow engine to cool completely before beginning work. Intake components can retain heat for extended periods.
⚠Do not use metal scrapers on aluminum intake manifold surfaces. Scratches or gouges will cause leaks.
ℹ️This engine does not use coolant in the intake manifold. No coolant drainage is required.
⚠️Disconnect both battery cables and wait 2 minutes before working near fuel system components.
Tools required
Socket set (metric)Essential
Torque wrench (5-30 Nm range)Essential
Gasket scraper (plastic)Essential
Brake cleaner or degreaserEssential
Clean lint-free ragsEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Intake manifold gasket × 1 — Use OEM specification
- Throttle body gasket (if equipped) × 1 — Inspect and replace if damaged
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Preparation
- Park vehicle on level surface and engage parking brake
- Disconnect negative battery cable, then positive battery cable
- Wait at least 2 minutes for electrical system discharge
- Remove engine cover if equipped
- Take photos of vacuum line routing, electrical connections, and fuel line positions for reference during reassembly
Procedure
- 1Disconnect intake plumbing and air filter housingLoosen clamp at the turbocharger compressor inlet and disconnect the intake tube. Remove air filter housing assembly by disconnecting any mounting bolts and separating from turbocharger. Set aside in clean area.
- 2Remove throttle body assemblyThis engine does not use a throttle body. Air intake on the 5.9L Cummins is unrestricted (no throttle plate); fueling is controlled electronically. Skip this step — there is no throttle body to remove.Torque specThrottle Body Bolts10 Nm (7 lb-ft)
- 3Disconnect fuel system componentsThe 5.9L common-rail fuel system operates at extremely high pressure. Do NOT loosen the high-pressure fuel lines unless required — allow the system to depressurize per FSM procedure and observe all high-pressure fuel safety precautions. In most cases the fuel rail and high-pressure lines do not need to be disturbed to replace the intake manifold gasket; disconnect only what is necessary for manifold removal.
- 4Remove fuel rail assemblyOn the 5.9L Cummins, the fuel rail mounts to the cylinder head and the injectors are retained in the head, connected via individual high-pressure lines. The fuel rail generally does not need removal to replace the intake manifold (grid heater) gasket. If access requires it, follow the FSM high-pressure fuel line and rail removal procedure.Torque specFuel Rail Bolts12 Nm (9 lb-ft)
- 5Disconnect vacuum lines and electrical connectionsDisconnect any electrical connectors attached to intake manifold components (e.g., intake air temperature/manifold pressure sensor and the intake grid heater connections). Note that this diesel does not run vacuum lines off the intake manifold. Disconnect the EGR connection if equipped (2007 emissions configuration).
- 6Remove intake manifold mounting boltsRemove all intake manifold mounting bolts in reverse order from center outward (opposite of tightening sequence). Refer to the FSM for the exact number of bolts securing the intake manifold/grid heater assembly on the 5.9L Cummins. Keep bolts organized and inspect for damage or thread wear.Torque specIntake Manifold Bolts25 Nm (18 lb-ft)
- 7Remove intake manifoldCarefully lift intake manifold away from cylinder head. The manifold may be stuck to the gasket - gently work it loose with a plastic pry tool if needed, being careful not to damage sealing surfaces. Cover cylinder head ports immediately with clean rags or tape to prevent debris entry.
- 8Clean gasket surfaces on cylinder headUse plastic gasket scraper to remove all old gasket material from cylinder head surface. Follow with nylon brush to remove residue. Clean surface thoroughly with brake cleaner and lint-free rags. Use shop vacuum to remove any debris. Inspect surface for damage, warping, or corrosion. Surface must be completely clean and dry.
- 9Clean intake manifold mating surfaceRemove all old gasket material from intake manifold sealing surface using plastic scraper and nylon brush. Clean thoroughly with brake cleaner. Inspect manifold for cracks, especially around bolt holes and port openings. Ensure all passages are clear of debris.
- 10Install new intake manifold gasketRemove protective covering from new gasket. Position gasket on cylinder head, ensuring proper orientation (check for UP markings or port alignment). Verify all bolt holes and ports align correctly. Gasket should lay flat without forcing - do not use gasket sealer unless specifically required by gasket manufacturer.
- 11Install intake manifoldRemove protective covering from cylinder head ports. Carefully lower intake manifold onto gasket, aligning all ports and bolt holes. Do not slide manifold once positioned as this can tear or displace gasket. Insert all mounting bolts finger-tight before proceeding to torque.
- 12Torque intake manifold boltsUsing a torque wrench, tighten the intake manifold/grid heater bolts to the Cummins FSM-specified torque and sequence for the 5.9L ISB (verify exact value against factory documentation before tightening). Tighten evenly in the specified pattern.Torque specIntake Manifold Bolts25 Nm (18 lb-ft)
- 13Reinstall fuel rail assemblyIf injectors were disturbed, follow the FSM injector installation procedure: seat injectors with new hold-down/seal components, install the injector hold-down clamps, and connect high-pressure lines torqued to Cummins specification (high-pressure lines are typically one-time-use and must be replaced). Do not press-fit injectors via the rail.Torque specFuel Rail Bolts12 Nm (9 lb-ft)
- 14Reconnect fuel and electrical connectionsReconnect fuel supply and return lines to fuel rail, ensuring connections are secure. Reconnect all fuel injector electrical connectors. Reconnect all vacuum lines to proper ports as documented in photos. Reconnect any intake manifold sensors or electrical connections.
- 15Reinstall throttle body and intake systemReinstall the air filter housing and connect the intake tube to the turbocharger compressor inlet, tightening the clamp securely. (No throttle body, throttle position sensor, or throttle linkage is present on this diesel.)Torque specThrottle Body Bolts10 Nm (7 lb-ft)
Reassembly
- Reinstall engine cover if equipped
- Reconnect positive battery cable, then negative battery cable
- Double-check all electrical connections, vacuum lines, and fuel connections are secure
- Verify no tools or rags were left in engine compartment
Verification
- Turn ignition to ON position without starting to pressurize fuel system. Check for fuel leaks at fuel rail connections
- Start engine and allow to idle. Listen for abnormal hissing sounds indicating intake air leaks
- Check for smooth idle quality - rough idle may indicate vacuum leak or improper gasket seating
- Rev engine gently and verify throttle response is normal with no hesitation
- Inspect all connections for leaks while engine is running
- Test drive vehicle to confirm normal power delivery and acceleration
- After test drive, recheck all bolts and connections for any signs of looseness or leakage
Related trouble codes on this vehicle
Codes that commonly send this job to the bay — tap one for symptoms, causes, and diagnostic steps.
P0010Intake Camshaft Position Actuator Circuit/Open Bank 1P0011Intake Camshaft Position Timing Over-Advanced Bank 1P0020Intake Camshaft Position Actuator Circuit/Open Bank 2P0021Intake Camshaft Position Timing Over-Advanced Bank 2P0075Intake Valve Control Solenoid Circuit (Bank 1)P0076Intake Valve Control Solenoid Circuit Low (Bank 1)P0081Intake Valve Control Solenoid Circuit (Bank 2)P0082Intake Valve Control Solenoid Circuit Low (Bank 2)P0095Intake Air Temperature Sensor 2 CircuitP0096Intake Air Temperature Sensor 2 Circuit Range/PerformanceP0105Manifold Absolute Pressure/BARO CircuitP0110Intake Air Temperature (IAT) Sensor 1 Circuit
Chasing one of these codes and not sure which part is guilty? Ask a master mechanic about YOUR car →