engine
Intake Manifold
for 2007 Ram 3500 5.9L I6 Cummins · 4WD
Difficulty
Moderate
Time
4.0 h
Tools
10
Steps
15
✓Fact-checked. Built from OLP's spec database, then independently fact-checked line by line with every correction applied. Master-tech sign-off by Chris Hackleman is queued. Cross-check torque values against the factory manual, and stop if anything looks unsafe. How our data is made.
This procedure covers the removal and replacement of the intake manifold on a 2007 Ram 3500 with the 5.9L Cummins diesel engine, including disconnection of all related sensors, hoses, and the intake grid heater assembly.
Warnings
⚠Allow the engine to cool completely before beginning work. The intake manifold and turbocharger components can remain hot for several hours after operation.
⚠The intake grid heater is a high-amperage electrical component. Ensure battery is disconnected before removal.
ℹ️Mark or photograph all electrical connections and hose routing before disassembly for proper reassembly.
Tools required
Socket set (metric and SAE)Essential
Ratchet and extensionsEssential
Torque wrenchEssential
Screwdriver set (flat and Phillips)Essential
Pliers setEssential
Shop towelsEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Parts
- Intake manifold gasket × 1 — Use OEM specification
- Intake grid heater gasket × 1 — Use OEM specification
- Intake manifold bolts (if damaged) × 1 — Use OEM specification
- Hose clamps (if damaged) × 1 — Various sizes
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Preparation
- Park vehicle on level ground and engage parking brake
- Allow engine to cool completely for at least 2 hours
- Disconnect both battery cables, negative first, then positive
- Remove engine cover if equipped
- Take photographs of all hose and electrical connections for reference during reassembly
Procedure
- 1Disconnect air intake systemLoosen the clamp securing the air intake tube to the turbocharger inlet. Remove the intake tube and air filter housing assembly. Disconnect the crankcase breather hose from the intake tube. Set these components aside in a clean area.
- 2Disconnect electrical connectionsLocate and disconnect the intake air temperature (IAT) sensor connector on the intake manifold. Disconnect the intake grid heater electrical connectors (two large terminals on top of the intake manifold). These terminals are secured with nuts and require careful removal to avoid damaging the terminals.
- 3Remove intake grid heaterRemove the bolts securing the intake grid heater to the top of the intake manifold (typically 6-8 bolts around the perimeter). Carefully lift the grid heater assembly straight up and off the manifold. Note the gasket position and condition. Inspect the grid heater element for damage or cracks.
- 4Disconnect turbocharger inlet connectionLocate the charge-air (intercooler) tube connection to the intake manifold air horn. Loosen the clamp securing this connection and carefully separate the intake tube from the manifold inlet, taking care not to damage the mating surfaces. You may need to gently rock the connection to break it free.
- 5Disconnect vacuum and breather linesThis diesel engine does not use a vacuum brake booster (it uses hydro-boost), and there are no vacuum HVAC or EGR lines on the intake manifold. Disconnect the crankcase vent tube from the intake manifold and label the connection for reassembly. Disconnect the crankcase vent tube from the intake manifold. Label each connection or refer to your photographs for reassembly.
- 6Remove throttle linkage connectionsThis diesel engine has no throttle body, throttle position sensor, or throttle linkage on the intake manifold (fueling is electronically controlled via the accelerator pedal sensor). Skip this step; there are no throttle connections to remove.
- 7Remove intake manifold mounting boltsLocate all intake manifold mounting bolts securing the manifold to the cylinder head (typically 8-10 bolts). Begin loosening the bolts in a criss-cross pattern, working from the outer bolts toward the center. Remove all bolts completely and store them in a clean container. Note the location of any bolts that may be different lengths.
- 8Remove intake manifoldCarefully lift the intake manifold straight up and away from the cylinder head. The manifold may be stuck to the gasket, so gentle rocking may be necessary. Do not pry against the aluminum mating surfaces. Once free, remove the manifold completely and set aside on a clean work surface.
- 9Clean mating surfacesRemove the old gasket/seal from both the manifold and cylinder head surfaces. Use a plastic scraper and clean rag to carefully clean the mating surfaces on the cast-iron cylinder head and manifold, taking care not to gouge or scratch them. Wipe clean with shop towels. Inspect both surfaces for cracks, warping, or damage. Stuff clean shop towels into the intake ports of the cylinder head to prevent debris from entering.
- 10Install new gasket and manifoldRemove the shop towels from the intake ports. Position the new intake manifold gasket on the cylinder head, ensuring proper alignment with all intake ports and bolt holes. Carefully lower the intake manifold onto the gasket, aligning all bolt holes. Hand-thread all mounting bolts to ensure proper alignment before tightening.
- 11Torque intake manifold boltsTighten the intake manifold mounting bolts in a criss-cross pattern, working from the center outward. Follow the manufacturer's torque specification sequence if available. Since specific torque values are not provided in the database, consult a factory service manual or torque specification chart. Consult the factory service manual for the exact Cummins ISB 5.9L torque specification and sequence; do not rely on generic values, as intake/grid heater fastener torques must match Cummins documentation.
- 12Reconnect turbocharger connectionReconnect the turbocharger outlet to the intake manifold inlet. Install the V-band clamp or mounting bolts and tighten securely. Ensure proper alignment to avoid air leaks in the intake system.
- 13Install intake grid heaterPosition the new grid heater gasket on the intake manifold surface. Carefully lower the intake grid heater assembly onto the manifold, aligning all bolt holes. Install all mounting bolts and tighten in a criss-cross pattern to ensure even seating. Reconnect both electrical terminals to the grid heater, ensuring clean, tight connections.
- 14Reconnect all sensors and linesReconnect the IAT sensor electrical connector. Reattach all vacuum lines, breather hoses, and throttle linkage connections in their original positions using your photographs as reference. Ensure all hose clamps are tight and all connections are secure.
- 15Reinstall air intake systemReinstall the air intake tube and air filter housing assembly. Connect the crankcase breather hose. Tighten the clamp at the turbocharger inlet connection securely. Ensure the entire air intake path is properly sealed with no loose connections.
Reassembly
- Reconnect battery cables (positive first, then negative)
- Reinstall engine cover if equipped
- Double-check all electrical connections and hose clamps for security
- Verify no tools or shop towels were left in the engine compartment
Verification
- Start the engine and listen for any unusual hissing or air leak sounds from the intake manifold area
- Allow the engine to reach operating temperature and verify smooth idle with no misfires or rough running
- Check for air leaks around all intake connections using soapy water or by listening carefully
- Verify the intake grid heater is functioning by checking for a momentary delay before the engine starts (grid heater cycle)
- Test drive the vehicle to ensure normal power delivery and no check engine lights
- Perform a visual inspection after the test drive to verify no leaks or loose connections have developed
Related trouble codes on this vehicle
Codes that commonly send this job to the bay — tap one for symptoms, causes, and diagnostic steps.
P0010Intake Camshaft Position Actuator Circuit/Open Bank 1P0011Intake Camshaft Position Timing Over-Advanced Bank 1P0020Intake Camshaft Position Actuator Circuit/Open Bank 2P0021Intake Camshaft Position Timing Over-Advanced Bank 2P0075Intake Valve Control Solenoid Circuit (Bank 1)P0076Intake Valve Control Solenoid Circuit Low (Bank 1)P0081Intake Valve Control Solenoid Circuit (Bank 2)P0082Intake Valve Control Solenoid Circuit Low (Bank 2)P0095Intake Air Temperature Sensor 2 CircuitP0096Intake Air Temperature Sensor 2 Circuit Range/PerformanceP0105Manifold Absolute Pressure/BARO CircuitP0110Intake Air Temperature (IAT) Sensor 1 Circuit
Chasing one of these codes and not sure which part is guilty? Ask a master mechanic about YOUR car →