maintenance
Tire Rotation
for 2022 Rivian EDV 500 Dual Motor AWD (EDV) · AWD
Editorial review:Chris Hackleman — Master Technician · 20+ years · Jeff Moore — Master Mechanic · 20+ years
Difficulty
Easy
Time
2.0 h
Tools
7
Steps
11
✓Expert-verified. Personally reviewed and approved by OLP's master technicians (Chris Hackleman & Jeff Moore — 20+ years each). Always follow the vehicle's factory service information and torque specs.
This procedure rotates all four tires on the 2022 Rivian EDV 500 to ensure even tire wear and extend tire life, following the recommended rotation pattern for all-wheel drive electric vehicles.
Warnings
⚠️Never work under a vehicle supported only by a jack. Always use rated jack stands on stable, level ground.
⚠The EDV 500 weighs over 7,000 lbs. Ensure all lifting equipment is rated for the vehicle weight with adequate safety margin.
⚠High voltage battery system is present. Do not attempt to lift vehicle from battery pack area or damage electrical components.
ℹ️Tire rotation pattern for AWD vehicles: front-to-rear on same side, rear-to-front on same side (directional tires) OR cross pattern if non-directional.
Tools required
Wheel chocksEssential
Tire pressure gaugeEssential
As an Amazon Associate and Autel/ANCEL partner, OLP earns from qualifying purchases — how we link. This never changes the specs we publish.
Preparation
- Park vehicle on level, stable concrete or asphalt surface
- Engage parking brake firmly
- Place wheel chocks behind rear wheels before lifting front
- Verify tire type: check sidewall for directional arrows if tires are directional (affects rotation pattern)
- Mark each tire position with chalk (LF, RF, LR, RR) before removal to track rotation
- Loosen all lug nuts 1/4 turn while vehicle is on ground (do not remove)
- Identify wheel type (alloy or steel) to determine correct torque specification
Procedure
- 1Lift front of vehiclePosition floor jack under front designated lift point per owner's manual (typically reinforced frame rail). Lift front of vehicle until tires are just off ground. Immediately place jack stands under front jack points. Lower vehicle onto jack stands and verify stability before proceeding.
- 2Lift rear of vehiclePosition floor jack under rear designated lift point (typically rear axle or reinforced frame rail). Lift rear of vehicle until tires are just off ground. Place jack stands under rear jack points. Lower vehicle onto jack stands. Ensure all four corners are securely supported on jack stands before continuing.
- 3Remove all four wheelsRemove lug nuts completely from all four wheels, keeping each set of lug nuts with their respective wheel position markers. Remove all four wheels and place them in a safe location corresponding to their marked positions.
- 4Inspect tires and brakesInspect each tire for uneven wear patterns, damage, bulges, or embedded objects. Check tread depth at multiple points across each tire; if variation exceeds 2/32 inch, investigate suspension or alignment issues. Visually inspect brake pads, rotors, and calipers for abnormal wear or damage. Note any issues for follow-up service.
- 5Determine rotation patternFor directional tires (arrow on sidewall): rotate front-to-rear and rear-to-front on same side only. For non-directional tires: use cross pattern (left front to right rear, right front to left rear, left rear to right front, right rear to left front). EDV 500 typically uses non-directional tires unless aftermarket replacements installed.
- 6Mount tires in new positionsInstall each tire onto its new hub position according to chosen rotation pattern. Hand-thread all lug nuts onto studs to ensure proper seating. Do not torque yet.
- 7Initial lug nut tighteningUsing breaker bar or lug wrench, tighten lug nuts in star pattern (not sequential) to snug specification. This seats the wheel against the hub. Work around in star pattern 2-3 times until all lug nuts are snug but not final torqued.
- 8Lower vehicle to groundRaise vehicle slightly with floor jack to unload jack stands. Remove all four jack stands. Carefully lower vehicle completely to ground. Rock vehicle side-to-side to settle suspension.
- 9Final torque lug nutsUsing calibrated torque wrench, torque all lug nuts to specification in star pattern. For alloy wheels: 130 Nm (96 lb-ft). For steel wheels: 140 Nm (103 lb-ft). Make 2-3 complete passes in star pattern on each wheel to ensure even torque distribution and proper wheel seating.Torque specLug Nuts - Alloy Wheels130 Nm (96 lb-ft)Lug Nuts - Steel Wheels140 Nm (103 lb-ft)
- 10Verify tire pressuresCheck and adjust tire pressure on all four tires to specification listed on driver door jamb placard (typically 42-45 PSI for EDV 500 depending on load). Tire pressure should be checked cold. If tires are warm from driving, add 3-4 PSI to compensated for temperature increase.
- 11Test drive and recheckTest drive vehicle at low speed in safe area. Listen for unusual noises and feel for vibrations. Return to work area and recheck lug nut torque on all wheels using same star pattern and torque specification.
Reassembly
- No disassembly was required beyond wheel removal for this procedure
Verification
- All lug nuts torqued to specification in proper star pattern
- No wheel vibration or unusual noises during test drive
- All tire pressures set to door jamb specification
- Tire wear patterns documented and rotation pattern followed correctly
- Schedule lug nut recheck after 50 miles of driving per torque specification requirements