2024 RIVIAN EDV 500

Dual Motor AWD (EDV)AWDev
Founding sponsor spot is openYour name on every procedure for this vehicle, permanently.Sponsor — $99 →
ev-battery

Battery Junction Box

for 2024 Rivian EDV 500 Dual Motor AWD (EDV) · AWD
Editorial review:Chris HacklemanMaster Technician · 20+ years · Jeff MooreMaster Lexus & Toyota Mechanic · 20+ years
Difficulty
Expert
Time
5.0 h
Tools
11
Steps
15
Expert-verified. Personally reviewed and approved by OLP's master technicians (Chris Hackleman & Jeff Moore — 20+ years each). Always follow the vehicle's factory service information and torque specs.

This procedure covers the removal and replacement of the battery junction box on a 2024 Rivian EDV 500, which manages high-voltage power distribution between the battery pack and drive motors.

Warnings

⚠️High-voltage system operates at 400V+ and can cause severe injury or death. Only technicians with EV high-voltage certification should perform this procedure.
⚠️Wait minimum 15 minutes after HV system disconnection before touching any high-voltage components to allow capacitor discharge.
⚠️Always verify zero voltage with multimeter before touching HV cables or junction box connections.
Battery junction box weighs approximately 35 lbs. Use proper lifting technique or get assistance.
Do not bend or kink high-voltage cables during removal or installation. Damage may not be visible but can cause arcing.
ℹ️Document all HV connector positions and cable routing with photos before disassembly for reference during reinstallation.

Tools required

High-voltage insulated glove set (Class 0, 1000V minimum)Essential
Digital multimeter with high-voltage capabilityEssential
Torque wrench (10-100 Nm range)Essential
Rivian service software and diagnostic laptopEssential
Vehicle lift or jack stands rated for 7000+ lbsEssential
HV interlock tool setEssential
Socket set (metric, 8mm-19mm)Essential
Trim panel removal tools
Cable spreader tool
Wire brush (non-conductive)
Dielectric grease applicator

Parts

  • Battery junction box assembly × 1 — Use OEM specification
  • HV connector seals × 4 — Use OEM specification
  • Junction box mounting gasket × 1 — Use OEM specification
  • HV interlock connector × 1 — Use OEM specification
  • Cable tie/retention clips × 8 — Use OEM specification

Preparation

  1. Park vehicle on level surface and engage parking brake
  2. Ensure vehicle has been off for minimum 30 minutes to allow systems to power down
  3. Connect Rivian service software to vehicle diagnostic port
  4. Document any stored fault codes related to HV system
  5. Disconnect 12V auxiliary battery negative terminal and wait 5 minutes
  6. Remove front underbody access panels to expose battery pack area
  7. Put on high-voltage insulated gloves and verify glove integrity
  8. Place HV warning tags on steering wheel and charge port

Procedure

  1. 1
    Disable high-voltage system
    Using Rivian service software, initiate HV system shutdown procedure. Navigate to 'Service Mode' and select 'HV Isolation'. Verify on-screen confirmation that all contactors are open and system is isolated. Record confirmation code displayed on screen.
  2. 2
    Remove HV service disconnect
    Access the high-voltage service disconnect located under the center console area. Remove the protective cover by releasing two quarter-turn fasteners. Pull the orange service disconnect handle straight up to remove. Store in a secure location away from vehicle. Verify service disconnect indicator light on dash cluster is illuminated.
  3. 3
    Wait for capacitor discharge and verify isolation
    Wait minimum 15 minutes for high-voltage system capacitors to fully discharge. After waiting period, use high-voltage multimeter to verify zero voltage at test points on junction box cover. Measure between positive and negative bus bars, then from each to chassis ground. All readings must be below 5V DC before proceeding.
  4. 4
    Remove junction box protective cover
    Locate the battery junction box on the underside of the vehicle, forward of the battery pack. Remove eight perimeter bolts securing the aluminum protective cover. Carefully lower the cover, being mindful of any attached ground straps. Disconnect ground straps if present and set cover aside.
  5. 5
    Disconnect HV interlock circuit
    Locate the orange HV interlock connector on the side of the junction box. Press the locking tab and carefully disconnect the interlock connector. Inspect connector pins for damage or corrosion. This disables the HV interlock safety circuit.
  6. 6
    Disconnect low-voltage control connectors
    Identify three low-voltage control harness connectors on the junction box. These are typically gray or black multi-pin connectors. Press each connector's locking tab and carefully pull straight out to disconnect. Label each connector with its position (C1, C2, C3) using masking tape for reinstallation reference.
  7. 7
    Remove HV positive cable connection
    Locate the large orange high-voltage positive cable connection on the junction box. Remove the protective boot by pulling back on the retention collar. Remove the two or three bolts securing the cable lug to the positive bus bar. Use cable spreader tool if needed to relieve tension. Carefully move cable aside and cover exposed terminal with insulating cap.
  8. 8
    Remove HV negative cable connection
    Locate the large orange or blue high-voltage negative cable connection. Remove protective boot and securing bolts in same manner as positive cable. Use cable spreader tool to relieve any tension. Move cable aside and cover exposed terminal with insulating cap. Ensure cables are secured away from work area.
  9. 9
    Disconnect motor drive cables
    Identify the motor drive cables connecting to the junction box (typically two cables for dual motor configuration). Remove protective boots and securing hardware for each motor cable connection. Document which cable connects to front motor and which to rear motor. Carefully disconnect and secure each cable with insulating caps.
  10. 10
    Remove junction box mounting hardware
    Locate the four to six mounting bolts securing the junction box to the battery pack structure. These are typically 10mm or 13mm head bolts. Support the junction box weight before removing final bolts. Remove all mounting bolts and carefully note location of any spacers or alignment pins.
  11. 11
    Remove junction box assembly
    With all connections and mounting hardware removed, carefully lower the junction box assembly. The unit weighs approximately 35 lbs, so use proper lifting technique or have an assistant help. Inspect the mounting gasket and sealing surfaces for damage. Remove and discard old gasket material from battery pack mounting surface.
  12. 12
    Prepare new junction box
    Unpack new junction box and verify part number matches vehicle specification. Install new mounting gasket onto junction box. Apply thin layer of dielectric grease to all HV cable connection points on the new junction box. Inspect all connector sockets for foreign material or shipping plugs that need removal.
  13. 13
    Install new junction box assembly
    Carefully lift new junction box into position, aligning mounting holes with battery pack structure. Ensure gasket remains properly seated. Install mounting bolts finger-tight initially to allow for positioning adjustment. Verify alignment, then torque mounting bolts in star pattern. Follow torque specifications provided in service manual for your specific model if available.
  14. 14
    Reconnect HV cables
    Remove insulating caps from HV cables. Clean cable lug contact surfaces with wire brush if needed. Reconnect motor drive cables first, followed by negative cable, then positive cable. Install new connector seals on each connection. Torque all HV cable connections per service manual specifications. Apply dielectric grease to exposed connection areas before installing protective boots.
  15. 15
    Reconnect control circuits and verify installation
    Reconnect all low-voltage control harness connectors in their documented positions, ensuring positive click engagement. Reconnect HV interlock connector. Reinstall protective cover and ground straps. Torque cover bolts evenly. Perform visual inspection of all connections before proceeding to system verification.

Reassembly

  1. Reinstall all underbody access panels and verify all fasteners are secure
  2. Remove HV warning tags from vehicle
  3. Reinstall HV service disconnect by pushing orange handle down until it clicks into place
  4. Reconnect 12V auxiliary battery negative terminal
  5. Connect Rivian service software and clear any service mode flags

Verification

  • Using Rivian service software, perform HV system integrity check to verify all connections are properly seated
  • Check for any new fault codes related to battery junction box or HV system
  • Perform insulation resistance test using service software - all readings should be above specification
  • Exit service mode and allow vehicle to power up normally
  • Verify battery junction box cooling fan operates when commanded through service software
  • Observe instrument cluster for any HV system warning lights or messages
  • Perform test drive to verify normal operation of both drive motors
  • Recheck all torque values on HV connections and mounting hardware
  • Document repair in vehicle service history with junction box serial number
🔧Stuck on this battery junction box? Take it to The Diag Desk.A human with 20+ years in the bay answers about YOUR Rivian within 24 hours — never AI. $25, and you're not charged unless you get an answer.Ask a tech →

More procedures for this vehicle

🔧 Database maintained under the daily editorial review of Chris Hackleman · Master Technician · 20+ years and Jeff Moore · Master Lexus & Toyota Mechanic · 20+ years. Spot an error? Use the Help link above — a human reads every report.
Stuck on this repair? Take it to The Diag Desk — ask a master tech about this exact car → real human answer within 24h, never AI
⚠ STILL BEHIND THE PAYWALL
The 2024 Rivian EDV 500 repair data is incomplete because no one has sponsored it yet. For $99, we generate the full step-by-step procedures, then fact-check them with a second AI pass and your expert review. Your name on every procedure, permanently.
The same data would cost $169/mo from Mitchell1 or $30/year from ALLDATAdiy — and you'd be renting access, not freeing it. Sponsor once, free forever.
Sponsor the Rivian EDV 500 — $99 →
Building an app?
Free API access to all this data — 50 requests/day, no card required.
Get an API key →
Run a shop?
Manage repairs, estimates, and customers with ShopBase — $249/mo, all features included.
Try ShopBase →